The new flashcard feature is useful to memorize questions.
?Change your study mode
At any time, you can change the study mode, and alternate between the practice mode and the exam mode. In practice mode, you can configure for example the number of questions or tests, and other parameters to help you study.
Randomized | 10 Questions per Test | 20 Minutes | 70% to pass|
To re-configure your study mode again and change - for example - the number of tests, whether you have random questions and all other configuration parameters.
?Simulator Configuration
Auto-scroll: You can use the automatic scrolling of the questionnaire that occurs as soon as you answer one or all of the answers to a question correctly. Auto scrolling is activated if you answer a single answer, or as soon as you answer all the mandatory answers. Learning Mode: During learning mode you can get a real time result for your answer.
Free Test
Question: / 10
20:00Min. left
?Restart the current test
To restart the current test by clearing all your answers and the time used up to now. Warning: all answers will be lost.
Question: / 10
4.9(114 Votes)
Quiz
Question 1/101/10
What gets measured, gets …’?
Select the answer:Select the answer
1 correct answer
A.
Measured
B.
Procured
C.
Managed
D.
Lost
Managed. This an old management adage, which is intended to encourage managers to measure helpful indica- tors (not everything!).
Right Answer: C
Quiz
Question 2/102/10
Revenue-earning possibilities which are foregone as a result of implementing a plan; the cost of not doing something else.
Select the answer:Select the answer
1 correct answer
A.
Opportunity cost
B.
Absorption cost
C.
Indirect cost
D.
Overhead cost
An opportunity cost is the cost of not being able to do something else. For example, if a firm opts to build a new factory, it may not be able to create ten new retail outlets which was another option open to it, in spending these particular funds. Or if you buy a holiday, you may not be able to buy a new television. The television is the opportunity cost of the holiday ie the benefit foregone. The other types of cost shown are methods of classifying actual (real) costs. Opportunity costs are, in a sense, not real; they are hypothesized and therefore do not show in the balance sheet or profit and loss account of a business.
Right Answer: A
Quiz
Question 3/103/10
Contracts published by third party experts such as trade associations or professional bodies, widely regarded as favouring neither buyer nor seller, are called:
Select the answer:Select the answer
1 correct answer
A.
Uni form
B.
Model form
C.
Paper form
D.
Trans form
E.
Good form
These are 'model form' contracts. Industry standard templates eg NEC ('New Engineering Con-tract'); or FIDIC model form contracts. You will find some examples produced by CIPS on the CIPS website eg for IT procurements.
Right Answer: B
Quiz
Question 4/104/10
Win-win negotiations can be described as expanding the:
Select the answer:Select the answer
1 correct answer
A.
Pie
B.
Sky
C.
Tie
D.
Dye
This is the idea that negotiations can be of the sort which shares the (apple) pie, often aggressively and not 50/50 (win-lose); or it can seek to create additional value - expand the pie (win-win).
Right Answer: A
Quiz
Question 5/105/10
Johnson, Scholes and Whittington suggested three key criteria for options which can be used in the evaluation of a business case. Which word was not one of these three key criteria?
Select the answer:Select the answer
1 correct answer
A.
Transferability
B.
Feasibility
C.
Acceptability
D.
Suitability
'Is it acceptable, feasible and suitable?' are the tests.
Right Answer: A
Quiz
Question 6/106/10
Key players have a:
Select the answer:Select the answer
1 correct answer
A.
High level of interest but little influence
B.
High level of interest and little power
C.
High level of power and a high level of interest
D.
High level of power but little interest
High level of power and a high level of interest. You should hope that in your exam you get such an easy QUESTION NO : !
Right Answer: C
Quiz
Question 7/107/10
Under a XXXX contract, the buyer does commit to purchase a given quantity over a given period of time, but the precise number of orders and their quantities is unknown at the start of the period. What expression has been replaced by XXXX?
Select the answer:Select the answer
1 correct answer
A.
Call-off
B.
Framework
C.
Oral
D.
Term
The fact that the time period and the total quantity is known means it is a 'call-off' contract. The volumes of product are 'called off' from the contract as required by the buying organisation. Make sure you understand the difference between a call-off contract and a framework arrangement. Under a framework arrangement, there is no obligation on the part of the buyer to use the goods / services specified.
Right Answer: A
Quiz
Question 8/108/10
A ‘cause and effect’ or ‘fishbone’ diagram is also commonly known as:
Select the answer:Select the answer
1 correct answer
A.
A Murakami diagram
B.
A Fukushima diagram
C.
An Ishiguro diagram
D.
An Ishikawa diagram
The answer is an Ishikawa Diagram. Can be used in addressing quality problems, problems of under-performance, etc. The other Japanese-sounding names shown as possible answers are spurious - two are novelists, and Fukushima was a serious environmental radioactive leak at a nuclear power station on the coast of Japan.
Right Answer: D
Quiz
Question 9/109/10
‘A purchasing procedure whereby potential suppliers are invited to make a firm and unequivocal offer of the price and terms on which they will supply specified goods or services which, on ac- ceptance, shall be the basis of the subsequent contract’
Select the answer:Select the answer
1 correct answer
A.
Competitive dialogue
B.
Request for information
C.
Invitation to tender
D.
Expression of interest
The 'firm and unequivocal offer' and 'the basis of a contract' indicate the reference to a formal and binding tender procedure. The answer is therefore 'invitation to tender'.
Right Answer: C
Quiz
Question 10/1010/10
What is a contract?
Select the answer:Select the answer
1 correct answer
A.
An agreement between two or more parties which is intended to be enforceable by any means feasible.
B.
An agreement between two or more parties which is enforceable in law.
C.
An agreement between two or more parties which is intended to be honoured.
D.
An agreement between two or more parties which, all other things being equal, is in-tended to be enforceable by law.
An agreement between two or more parties which is enforceable in law. This definition separates a contract from a social or domestic arrangement, in that contracts are in- tended to be enforceable at law. The other answers shown here dilute the concept, and so are unac- ceptable as answers to the question.
L3M3: CIPS Contract Administration Practice test unlocks all online simulator questions
Thank you for choosing the free version of the L3M3: CIPS Contract Administration practice test! Further deepen your knowledge on CIPS Simulator; by unlocking the full version of our L3M3: CIPS Contract Administration Simulator you will be able to take tests with over 90 constantly updated questions and easily pass your exam. 98% of people pass the exam in the first attempt after preparing with our 90 questions.
What to expect from our L3M3: CIPS Contract Administration practice tests and how to prepare for any exam?
The L3M3: CIPS Contract Administration Simulator Practice Tests are part of the CIPS Database and are the best way to prepare for any L3M3: CIPS Contract Administration exam. The L3M3: CIPS Contract Administration practice tests consist of 90 questions and are written by experts to help you and prepare you to pass the exam on the first attempt. The L3M3: CIPS Contract Administration database includes questions from previous and other exams, which means you will be able to practice simulating past and future questions. Preparation with L3M3: CIPS Contract Administration Simulator will also give you an idea of the time it will take to complete each section of the L3M3: CIPS Contract Administration practice test . It is important to note that the L3M3: CIPS Contract Administration Simulator does not replace the classic L3M3: CIPS Contract Administration study guides; however, the Simulator provides valuable insights into what to expect and how much work needs to be done to prepare for the L3M3: CIPS Contract Administration exam.
L3M3: CIPS Contract Administration Practice test therefore represents an excellent tool to prepare for the actual exam together with our CIPS practice test . Our L3M3: CIPS Contract Administration Simulator will help you assess your level of preparation and understand your strengths and weaknesses. Below you can read all the quizzes you will find in our L3M3: CIPS Contract Administration Simulator and how our unique L3M3: CIPS Contract Administration Database made up of real questions:
Info quiz:
Quiz name:L3M3: CIPS Contract Administration
Total number of questions:90
Number of questions for the test:50
Pass score:80%
You can prepare for the L3M3: CIPS Contract Administration exams with our mobile app. It is very easy to use and even works offline in case of network failure, with all the functions you need to study and practice with our L3M3: CIPS Contract Administration Simulator.
Use our Mobile App, available for both Android and iOS devices, with our L3M3: CIPS Contract Administration Simulator . You can use it anywhere and always remember that our mobile app is free and available on all stores.
Our Mobile App contains all L3M3: CIPS Contract Administration practice tests which consist of 90 questions and also provide study material to pass the final L3M3: CIPS Contract Administration exam with guaranteed success.
Our L3M3: CIPS Contract Administration database contain hundreds of questions and CIPS Tests related to L3M3: CIPS Contract Administration Exam. This way you can practice anywhere you want, even offline without the internet.