The new flashcard feature is useful to memorize questions.
?Change your study mode
At any time, you can change the study mode, and alternate between the practice mode and the exam mode. In practice mode, you can configure for example the number of questions or tests, and other parameters to help you study.
Randomized | 10 Questions per Test | 20 Minutes | 70% to pass|
To re-configure your study mode again and change - for example - the number of tests, whether you have random questions and all other configuration parameters.
?Simulator Configuration
Auto-scroll: You can use the automatic scrolling of the questionnaire that occurs as soon as you answer one or all of the answers to a question correctly. Auto scrolling is activated if you answer a single answer, or as soon as you answer all the mandatory answers. Learning Mode: During learning mode you can get a real time result for your answer.
Free Test
Question: / 10
20:00Min. left
?Restart the current test
To restart the current test by clearing all your answers and the time used up to now. Warning: all answers will be lost.
Question: / 10
4.6(302 Votes)
Quiz
Question 1/101/10
AST Codes and Standards
AST Codes and Standards
AST Codes and Standards
Which code is the primary national consensus standard adopted in the United States that governs the installation of aboveground storage tanks containing flammable and combustible liquids?
Select the answer:Select the answer
1 correct answer
A.
NFPA 70
B.
NFPA 30
C.
NFPA 99
D.
NFPA 13
Explanation: The Flammable and Combustible Liquids Code is the foundational consensus document that establishes minimum requirements for the safe storage, handling, dispensing, and use of flammable and combustible liquids stored in aboveground tanks. It addresses tank construction, location, separation, venting, secondary containment, piping, leak detection, and overfill prevention. The code classifies liquids by flash point and boiling point into Class I, II, and III categories and applies different requirements based on hazard category. It is referenced extensively by the International Fire Code and adopted by most state and local authorities having jurisdiction. Other widely used codes address electrical wiring, healthcare facilities, and water-based fire protection sprinkler systems, but they do not establish the comprehensive aboveground storage tank installation requirements applicable to flammable and combustible liquid storage. An installer or inspector working on AST projects must be thoroughly familiar with this code because it dictates spacing, dike capacity, vent sizing, and operational safeguards that protect property and occupants from fire and explosion hazards.
Right Answer: B
Quiz
Question 2/102/10
Tank Construction and Materials
Tank Construction and Materials
Tank Construction and Materials
The minimum steel thickness for the shell of a UL 142 horizontal aboveground tank with a capacity of 1,100 gallons is generally specified as which gauge?
Select the answer:Select the answer
1 correct answer
A.
14 gauge
B.
12 gauge
C.
10 gauge
D.
7 gauge
Explanation: UL 142 prescribes minimum shell, head, and bottom plate thickness based on tank capacity, configuration, and orientation. For shop-fabricated horizontal tanks in the 551 to 1,100 gallon range, the standard typically requires twelve gauge shell material as a minimum. Lighter gauges are allowed for smaller tanks while progressively heavier gauges are required as capacity increases. Larger horizontal tanks above 1,100 gallons commonly require ten gauge or heavier material, and very large tanks require quarter-inch plate or thicker. Thinner gauges than required do not satisfy the listing standard and would be rejected. The thickness selection accounts for hydrostatic load, vehicle and pedestrian impact resistance, corrosion allowance, and structural rigidity during fabrication and handling. Inspectors verify the gauge by confirming the manufacturer's nameplate and reviewing the shop fabrication records when available. Field measurement of an installed tank's shell thickness is rarely possible without intrusive inspection, so the documentation chain from steel mill certification through fabrication is the practical means of verification.
Right Answer: B
Quiz
Question 3/103/10
Foundation and Support Systems
Foundation and Support Systems
Foundation and Support Systems
The foundation for a vertical AST should be designed to support what minimum loading combination?
Select the answer:Select the answer
1 correct answer
A.
The empty tank weight only
B.
The weight of the tank, contents, equipment, and design wind and seismic forces
C.
The weight of the tank and equipment only, ignoring contents
D.
Only the shipping weight of the tank
Explanation: An AST foundation must support the dead loads, live loads, and lateral loads that the tank will experience during its service life. The weight of the empty tank, the maximum weight of the contents at design density, the weight of attached equipment such as ladders and platforms, snow loads on the roof, wind loads on the shell, and seismic loads all contribute to foundation design. Supporting only the empty tank weight would lead to settlement, cracking, or collapse when the tank is filled. Ignoring contents misses the dominant load. Considering only shipping weight is meaningless for a permanent installation. Engineers calculate bearing pressures, anchor bolt forces, settlement limits, and overturning moments, then design the foundation accordingly. Inspectors verify the foundation design documents, witness reinforcement placement and concrete pours, and confirm that anchor bolts are placed accurately. Foundations that fail to address all applicable loads can settle differentially, transmit loads improperly, or fail catastrophically during environmental events.
Right Answer: B
Quiz
Question 4/104/10
Venting Requirements
Venting Requirements
Venting Requirements
Normal venting on an atmospheric AST must be sized for which conditions at minimum?
Select the answer:Select the answer
1 correct answer
A.
Maximum filling rate, maximum withdrawal rate, and thermal effects
B.
Withdrawal rate only
C.
Filling rate only
D.
Wind speed only
Explanation: Normal vent capacity must accommodate the maximum out-breathing during product filling, the maximum in-breathing during product withdrawal, and thermal contraction and expansion driven by daily temperature changes. The total demand is the sum of these effects calculated per the appropriate venting standard. Sizing for only one of these conditions can leave the tank vulnerable to overpressure during filling or vacuum collapse during withdrawal. Wind speed influences the placement and weather hardening of the vent but is not a sizing criterion for normal venting. The vent must remain unobstructed under all expected weather conditions including ice, snow, and dust loading. Inspectors verify the vent capacity calculation, the vent's listed flow rate, and the connection size matches the calculated demand. Where multiple tanks share a single vent or where the vent feeds an emission control system, the calculation must account for combined demand and any back-pressure from downstream equipment.
Right Answer: A
Quiz
Question 5/105/10
Overfill Prevention and Spill Control
Overfill Prevention and Spill Control
Overfill Prevention and Spill Control
An audible high-level alarm on an AST should typically activate at:
Select the answer:Select the answer
1 correct answer
A.
Approximately 90 percent of tank capacity
B.
100 percent of tank capacity
C.
50 percent of tank capacity
D.
25 percent of tank capacity
Explanation: Overfill prevention systems use a tiered approach that includes a high-level audible and visible alarm to warn the operator before the tank reaches overflow conditions. The alarm typically activates around 90 percent of capacity, providing time to stop the delivery before the tank overfills. A 100 percent setting provides no warning before overflow. A 50 percent setting alarms too early and would create nuisance alarms. A 25 percent setting is far too low to be useful for overfill prevention. Code provisions require both an alarm and a backup mechanical means of preventing overfill, such as an automatic shutoff valve that closes at a higher level than the alarm setpoint. Inspectors verify the alarm setpoint, the alarm's audible and visible signaling devices, and the system's overall configuration. The alarm signals must be located where the delivery operator can hear and see them, typically near the fill connection at retail and fleet fueling sites.
Right Answer: A
Quiz
Question 6/106/10
Secondary Containment and Dikes
Secondary Containment and Dikes
Secondary Containment and Dikes
The minimum dike capacity for a single tank is generally:
Select the answer:Select the answer
1 correct answer
A.
The capacity of the tank, with allowance for displaced volume of structures inside the dike
B.
Half the capacity of the tank
C.
Twice the capacity of the tank
D.
One tenth of the capacity of the tank
Explanation: For diked installations containing a single tank, the dike must hold the volume of the entire tank in the event of complete release, less the volume displaced by any structures inside the dike. The capacity calculation accounts for the actual usable volume below the lowest point of the dike walls. Half the capacity, twice the capacity, and one tenth of the capacity are not the standard. Some specific situations require freeboard for rainfall accumulation, particularly for outdoor installations in regions with significant precipitation. Inspectors review the dike capacity calculation, verify the dike walls and floor are intact, and confirm any drains are properly configured. Where the dike has settled, eroded, or been modified, the calculation must be updated to reflect actual current conditions. Documentation of the calculation and the as-built dimensions supports inspection and is part of the facility's environmental records.
Right Answer: A
Quiz
Question 7/107/10
Corrosion Protection
Corrosion Protection
Corrosion Protection
The two principal forms of cathodic protection used on steel ASTs are:
Select the answer:Select the answer
1 correct answer
A.
Galvanic (sacrificial) and impressed current systems
B.
Inductive and capacitive systems
C.
Magnetic and electric systems
D.
Liquid and solid systems
Explanation: Cathodic protection prevents corrosion of steel structures in soil or water by applying a small electrical current that suppresses the natural anodic reactions on the steel surface. Two principal methods are used. Galvanic systems use sacrificial anodes such as magnesium, zinc, or aluminum buried near the structure; the anodes corrode preferentially, protecting the steel. Impressed current systems use an external power source connected to inert anodes such as graphite or mixed metal oxide that polarize the steel cathodically. Inductive, capacitive, magnetic, electric in general, and liquid versus solid distinctions are not the recognized cathodic protection categories. Inspectors verify the cathodic protection system design and installation, the location and number of anodes, the test stations for monitoring potentials, and the records of periodic potential measurements. Documentation of design calculations, installation as-builts, and operating records supports compliance with applicable corrosion protection standards.
Right Answer: A
Quiz
Question 8/108/10
Piping Systems
Piping Systems
Piping Systems
Piping carrying flammable or combustible liquids in AST systems must be:
Select the answer:Select the answer
1 correct answer
A.
Designed and installed per applicable piping codes and listed for the service
B.
Made of any material at hand
C.
Plastic for cost savings
D.
Garden hose for flexibility
Explanation: Piping carrying flammable and combustible liquids must be designed and installed per applicable piping codes such as ASME B31.3 or B31.4 for process and pipeline service, and individual components must be listed for the service. Material selection considers compatibility with the product, pressure rating, temperature range, and exterior environment. Generic plastics may be unsuitable due to fire performance and chemical compatibility, although specific listed plastics are appropriate for some applications. Garden hose is not designed for product transfer service. Inspectors review the piping specification, verify materials and components match the design, and confirm welds, threaded connections, and flanged connections are properly executed. Documentation of pipe materials, weld procedures, and pressure testing supports the integrity of the piping system. Where retrofit work modifies the piping, current code provisions apply to the new and altered work.
Right Answer: A
Quiz
Question 9/109/10
Leak Detection and Monitoring
Leak Detection and Monitoring
Leak Detection and Monitoring
Interstitial monitoring of a double-wall AST detects leaks by:
Select the answer:Select the answer
1 correct answer
A.
Sensing changes in the interstitial space such as liquid presence, pressure, or vacuum
B.
Counting product molecules
C.
Measuring tank weight
D.
Checking the tank temperature
Explanation: Double-wall tanks have a space between the inner and outer walls that is monitored for leaks. Detection methods include sensing liquid presence in a normally dry interstice, detecting pressure changes in a maintained pressure interstice, or detecting vacuum loss in a vacuum-monitored interstice. Counting molecules, measuring tank weight, or checking temperature are not standard interstitial methods. Inspectors verify the leak detection method matches the tank design, the equipment is properly installed and calibrated, and operational testing has confirmed function. Periodic monitoring is part of operational permit requirements. Records of monitoring, alarms, and any investigations support compliance with environmental regulations and code requirements.
Right Answer: A
Quiz
Question 10/1010/10
Tank Testing and Integrity
Tank Testing and Integrity
Tank Testing and Integrity
The hydrostatic test of a newly installed tank is intended to:
Select the answer:Select the answer
1 correct answer
A.
Verify structural integrity at design loading and identify any leaks before service
B.
Increase tank capacity
C.
Measure tank weight
D.
Train operators
Explanation: A hydrostatic test fills the tank with water to the design liquid level and holds the load for a specified period to verify structural integrity at the maximum design loading. The test identifies leaks at welds, fittings, and connections that may not be evident under empty conditions. Capacity, weight measurement, and operator training are not the test purpose. Inspectors witness or review the hydrostatic test, verify the test water level matches the design, and observe for any leaks or unusual conditions during the test. Settlement monitoring during the test identifies any inadequate foundation or subgrade conditions. Documentation of the test, including water levels, hold times, and observations, supports compliance with construction standards and provides a baseline for the tank's service life.
U5: U5-AST Installation/Retrofitting Practice test unlocks all online simulator questions
Thank you for choosing the free version of the U5: U5-AST Installation/Retrofitting practice test! Further deepen your knowledge on ICC - International Code Council Simulator; by unlocking the full version of our U5: U5-AST Installation/Retrofitting Simulator you will be able to take tests with over 508 constantly updated questions and easily pass your exam. 98% of people pass the exam in the first attempt after preparing with our 508 questions.
What to expect from our U5: U5-AST Installation/Retrofitting practice tests and how to prepare for any exam?
The U5: U5-AST Installation/Retrofitting Simulator Practice Tests are part of the ICC - International Code Council Database and are the best way to prepare for any U5: U5-AST Installation/Retrofitting exam. The U5: U5-AST Installation/Retrofitting practice tests consist of 508 questions and are written by experts to help you and prepare you to pass the exam on the first attempt. The U5: U5-AST Installation/Retrofitting database includes questions from previous and other exams, which means you will be able to practice simulating past and future questions. Preparation with U5: U5-AST Installation/Retrofitting Simulator will also give you an idea of the time it will take to complete each section of the U5: U5-AST Installation/Retrofitting practice test . It is important to note that the U5: U5-AST Installation/Retrofitting Simulator does not replace the classic U5: U5-AST Installation/Retrofitting study guides; however, the Simulator provides valuable insights into what to expect and how much work needs to be done to prepare for the U5: U5-AST Installation/Retrofitting exam.
U5: U5-AST Installation/Retrofitting Practice test therefore represents an excellent tool to prepare for the actual exam together with our ICC - International Code Council practice test . Our U5: U5-AST Installation/Retrofitting Simulator will help you assess your level of preparation and understand your strengths and weaknesses. Below you can read all the quizzes you will find in our U5: U5-AST Installation/Retrofitting Simulator and how our unique U5: U5-AST Installation/Retrofitting Database made up of real questions:
Info quiz:
Quiz name:U5: U5-AST Installation/Retrofitting
Total number of questions:508
Number of questions for the test:50
Pass score:80%
You can prepare for the U5: U5-AST Installation/Retrofitting exams with our mobile app. It is very easy to use and even works offline in case of network failure, with all the functions you need to study and practice with our U5: U5-AST Installation/Retrofitting Simulator.
Use our Mobile App, available for both Android and iOS devices, with our U5: U5-AST Installation/Retrofitting Simulator . You can use it anywhere and always remember that our mobile app is free and available on all stores.
Our Mobile App contains all U5: U5-AST Installation/Retrofitting practice tests which consist of 508 questions and also provide study material to pass the final U5: U5-AST Installation/Retrofitting exam with guaranteed success.
Our U5: U5-AST Installation/Retrofitting database contain hundreds of questions and ICC - International Code Council Tests related to U5: U5-AST Installation/Retrofitting Exam. This way you can practice anywhere you want, even offline without the internet.