Which of the following statements describing the consequences of specifying test conditions at a
detailed level is NOT true?
K2 1 credit
Select the answer
1 correct answer
A.
In an environment where the test basis is continuously changing, it is recommended to specify test
conditions at a detailed level in order to achieve a better maintainability
B.
The specification of test conditions at a detailed level can be effective when no formal
requirements or other development work products are available
C.
The specification of test conditions at a detailed level can require the implementation of an
adequate level of formality across the team
D.
For system testing, the specification of test conditions at a detailed level, carried out early in the
project as soon as the test basis is established, can contribute to defect prevention

Quiz

2/10
Assume you are the Test Manager for a new software release of an e-commerce application.
The server farm consists of six servers providing different capabilities. Each capability is provided
through a set of web services.
The requirements specification document contains several SLAs
(Service Level Agreements) like the following:
SLA-001: 99.5 percent of all transactions shall have a response time less than five seconds under a
load of up-to 5000 concurrent users
The main objective is to assure that all the SLAs specified in the requirements specification document
will be met before system release. You decide to apply a risk-based testing strategy and an early risk
analysis confirms that performance is high risk. You can count on a well-written requirements
specification and on a model of the system behavior under various load levels produced by the
system architect.
Which of the following test activities would you expect to be the less important ones to achieve the
test objectives in this scenario?
K4 3 credits
Select the answer
1 correct answer
A.
Perform unit performance testing for each single web service
B.
Monitor the SLAs after the system has been released into the production environment
C.
Perform system performance testing, consisting of several performance testing sessions, to verify
if all the SLAs have been met
D.
Perform static performance testing by reviewing the architectural model of the system under
various load levels

Quiz

3/10
Consider an information system of a Pay-Tv company based on a SOA architecture.
The integrated system currently consists of three core systems:
- a CRM (Customer Relationship Management) system
- a BRM (Billing and Revenue Management) system
- a CAS (Conditional Access System) system all of them communicating with SOA Middleware.
You have been asked to manage the testing activities for the integration of two additional off-
theshelf systems from two different vendors: a SMS (Short Message Service) server and an IVR
(Interactive Voice Response) system.
Assume that there is a high likelihood that the two off-the-shelf systems will be low-quality and that
you have a clear proof that the testing performed by the two vendors on their systems has been
unsystematic and unprofessional. This obviously leads to higher quality risk for the overall integrated
system.
You are the Test Manager of this project. Your main goal is to plan for testing activities to mitigate
this risk.
Which of the following answers best describes the test activities (assuming it is possible to perform
all of them) you should plan for?
K4 3 credits
Select the answer
1 correct answer
A.
You should plan for an informal and minimal acceptance test of the two off-the-shelf systems and
then a single end-to-end test of the overall integrated system
B.
You should directly plan for a single end-to-end test focused on end-to-end tests of the overall
integrated system without an acceptance test of the two off-the-shelf systems
C.
You should plan for two levels: a system integration test and an end-to-end test of the overall
integrated system
D.
You should plan for adequate re-testing of both the systems followed by a system integration test
and an end-to-end test of the overall integrated system

Quiz

4/10
The following are the exit criteria described in the test plan of a software product:
EX1. The test suite for the product must ensure that at least each quality risk item is covered by at
least one test case (a quality risk item can be covered by more test cases).
EX2. All test cases in the test suite must be run during the execution phase.
EX3. Defects are classified into two categories: “C” (critical defect) and “NC” (non-critical defect).
No known C defects shall exist in the product at the end of the test execution phase.
Which of the following information is useless when the specified exit criteria is evaluated? K2 1
credit
Select the answer
1 correct answer
A.
A traceability matrix showing the relationships between the product risk items and the test cases
B.
A list of all the open defects with the associated classification information extracted from the
defect tracking system
C.
A chart, showing the trend in the lag time from defect reporting to resolution, extracted from the
defect tracking system
D.
The execution status of all the test cases extracted from the test management tool

Quiz

5/10
Which of the following is an example of the test closure activity indicated as "lessons learned"? K2 1
credit
Select the answer
1 correct answer
A.
Archive all the test results of the acceptance testing phase
B.
Deliver a list of the open defects of a software product released into production to the service desk
team
C.
Participate in a meeting at the end of a project aimed at better managing the events and problems
of future projects
D.
Deliver an automated regression test suite, used during the system test phase of a software
product released into production, to the team responsible for maintenance testing

Quiz

6/10
Assume that you are the Test Manager for a small banking application development project. You
have decided to adopt a risk-based testing strategy and 5 product risks (R1, R2, R3, R4, and R5) have
been identified during the quality risk analysis. The following table shows the risk level associated to
these product risks (higher numbers mean higher risk):


Certification Exam ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) iSQI iSQI-CTAL-TM_UK 2-1938570573



55 test cases have been designed and implemented to cover all these 5 product risks. The coverage is
described in a traceability matrix.
This is the test execution status table, after the after the first week of test execution:
About 56% of the planned test cases have been successfully executed.
Assume that no additional product risks have been identified during the first week of test execution.






Certification Exam ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) iSQI iSQI-CTAL-TM_UK 3-226153068



Which of the following answers would you expect to best describe the residual risks associated with
the identified product risks, at the end of the first week of test execution? K3 2 credits
Select the answer
1 correct answer
A.
Since R3 is the only risk for which all test cases have passed, the risk has been reduced by 20%
B.
The test execution status table indicates that the risk has been reduced by 56%
C.
The residual risk level can’t be determined, because it requires that all the test cases have been
executed
D.
The test execution table doesn’t give an indication of the risk level of the open defects and the test
cases that failed or are not run yet

Quiz

7/10
You are the Test Manager for a project to develop a client-server application that allows wine
vendors to order custom-assorted packages of wines of several winemakers to sell special packages
in their wine shops.
You decide to apply a blended risk-based and reactive testing strategy. Below the exit criteria for the
system testing.
EXCR1- Each “critical” quality risk item must be covered by at least one test condition EXCR2- Each
“critical” requirement must be covered by at least one test condition The following are the “critical”
requirements of the application:
REQ-SEL-1. The application shall allow the user to order only one package at a time
REQ-SEL-2. The application shall allow the user to select between four different packages (2-bottles, 6-
bottles, 12-bottles, 15-bottles)
REQ-SEL-3. The application shall allow the user to order a package containing at least 1 bottle and no
more bottles than the package size. No error messages shall be displayed if the user selects a valid
number of bottles (at least 1 bottle and no more than the package size) REQ-SEL-4. The application
shall display an error message “Invalid number of bottles” if an invalid number of bottles is selected
by the user (zero bottles or a number higher than the package size)
REQ-PAY-1. The application shall allow the user to pay with the three accepted credit cards (Visa,
MasterCard, American Express)
REQ-PAY-2. The application shall display an error message “Invalid credit card” if invalid credit card
data are given by the user
The following is the unique “critical” quality risk item that has been identified:
CR-RSK-1. The GUI of the application might accept non-integer values for the input field designed
to get the number of bottles from the user
Test analysis for system testing has just begun and the following test conditions have been identified.
TC-SEL-2. Test the selection of the package sizes



TC-SEL-4. Test wrong numbers of bottles for an order
TC-CR-RSK-1. Test the accepted values from the input field designed to get the number of bottles
from the user Assume that you have used traceability to determine the logical test cases that cover
all the requirements and the single risk item identified in that scenario.
Which of the following is a positive logical test that is complete and correct, and covers the REQSEL-4
requirement?
K3 2 credits
Select the answer
1 correct answer
A.
Select a 6-bottles package, then try to insert 5 bottles; verify that no error messages are displayed
B.
Select a 6-bottles package, then try to insert 7 bottles; verify that no error messages are displayed
C.
Select a 6-bottles package, then try to insert 7 bottles; verify that the "Invalid number of bottles"
message is displayed
D.
Select a 6-bottles package, then try to insert 7 bottles

Quiz

8/10
The following are the requirements identified as “critical”:
REQ-SEL-001. The user shall be able to combine all the three products with all the four durations to
define an item to purchase
REQ-SEL-002. The user shall be able to add a maximum of six different items to the shopping cart
REQ-PUR-001. The user shall be able to purchase all the items in the shopping cart using a credit
voucher
REQ-PUR-002. The user shall be able to purchase all the items in the shopping cart using the
available credit already charged on the smartcard
REQ-PUR-003. The user shall be able to purchase all the items in the shopping cart using all the
accepted credit cards (Visa, MasterCard and Great Wall Card)
REG-LOGO-001. The user shall be able to logout (by clicking the logout button) from both the “select”
and “purchase” pages going back to the “browse” page (anonymous navigation)
Moreover the following quality risk item has been identified as “critical”:
QR-P1. The web customer portal might not be able to provide the expected response time (less than
10 sec) for the purchase transactions under a load of up-to 1000 concurrent users Test analysis for
system testing has just begun and the following test conditions have been identified.
TC-SEL-01. Test the combinations of products and durations to define an item to purchase TC-SEL-02.
Test the maximum number of items, which can be added to the shopping cart
TC-PUR-01. Test the purchase of an item
TC-PUR-02. Test the purchase of an item with the credit charged on the smartcard
What is the MINIMUM number of test conditions that must be added to fulfill both the EXCR1 and
EXCR2 exit criteria?
K3 2 credits
Select the answer
1 correct answer
A.
1
B.
2
C.
3
D.
4

Quiz

9/10
You are the Test Manager for a project to develop a web customer portal of a Pay-TV company that
allows customers (with a smartcard and a set-top box) to purchase digital contents.
In the "select" page the system displays a dialogue where the customer can select the items (digital
contents) he/she is interested in. In this page he/she can add one or more items to a shopping cart.
An item consists of a product and a duration.
There are three types of products: Movie, sport and premium (movie and sport).
There are four possible durations: 1 months, 2 months, winter (from the beginning of January to end
of March) and summer (from the beginning of July to end of September).
All the combinations of products and durations are allowed to define an item. Thus there are twelve
possible items. A maximum of six different items can be added to the shopping cart at a time.
When the customer decides to check out he/she goes to the "purchase" page where he/she can pay
the total amount of the shopping cart in three different ways:
- using a credit voucher
- using a credit already charged on the smartcard
- using a credit card (accepted credit cards are. Visa, MasterCard and Great Wall Card)
The customer can logout from both the “select” and “purchase” pages. In this case no purchase is
made.
You decide to apply a blended risk-based and reactive testing strategy and the following is a subset of
the exit criteria for system testing:
EXCR1- Each “critical” quality risk item must be covered by at least one test condition EXCR2- Each
“critical” requirement must be covered by at least one test condition You are following a risk-based
testing strategy. The test execution time is very limited. Assume that all the product risk items
require more or less the same level of test effort.


Certification Exam ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) iSQI iSQI-CTAL-TM_UK 4-1156722381



Which of the following answers describes the best execution schedule in this scenario? K3 3 credits
Select the answer
1 correct answer
A.
1- Test the acceptance of transactions coming from the IVR channel
2- Test the correct charge of the Smart Card with the required contents
3- Test the correct pre-activation of the Smart Card
4- Test the correct activation of the Smart Card
B.
1- Test the correct pre-activation of the Smart Card
2- Test the correct charge of the Smart Card with the required contents
3- Test the correct activation of the Smart Card
4- Test the acceptance of transactions coming from the IVR channel
C.
1- Test the correct activation of the Smart Card
2- Test the correct pre-activation of the Smart Card
3- Test the correct charge of the Smart Card with the required contents
4- Test the acceptance of transactions coming from the IVR channel
D.
1- Test the correct pre-activation of the Smart Card
2- Test the correct activation of the Smart Card
3- Test the correct charge of the Smart Card with the required contents
4- Test the acceptance of transactions coming from the IVR channel

Quiz

10/10
You are the Test Manager for a project to develop a client-server application that allows wine
vendors to order custom-assorted packages of wines of several winemakers to sell special packages
in their wine shops.
You decide to apply a blended risk-based and reactive testing strategy. Below the exit criteria for the
system testing.
EXCR1- Each “critical” quality risk item must be covered by at least one test condition EXCR2- Each
“critical” requirement must be covered by at least one test condition
The following are the “critical” requirements of the application:
REQ-SEL-1. The application shall allow the user to order only one package at a time
REQ-SEL-2. The application shall allow the user to select between four different packages (2-bottles, 6-
bottles, 12-bottles, 15-bottles)
REQ-SEL-3. The application shall allow the user to order a package containing at least 1 bottle and no
more bottles than the package size. No error messages shall be displayed if the user selects a valid
number of bottles (at least 1 bottle and no more than the package size)
REQ-SEL-4. The application shall display an error message “Invalid number of bottles” if an invalid
number of bottles is selected by the user (zero bottles or a number higher than the package size) REQ-
PAY-1. The application shall allow the user to pay with the three accepted credit cards (Visa,
MasterCard, American Express)
REQ-PAY-2. The application shall display an error message “Invalid credit card” if invalid credit card
data are given by the user
The following is the unique “critical” quality risk item that has been identified:
CR-RSK-1. The GUI of the application might accept non-integer values for the input field designed to
get the number of bottles from the user
Test analysis for system testing has just begun and the following test conditions have been identified.
TC-SEL-2. Test the selection of the package sizes
TC-SEL-4. Test wrong numbers of bottles for an order
TC-CR-RSK-1. Test the accepted values from the input field designed to get the number of bottles
from the user
What is the MINIMUM number of test conditions that must be added to fulfill both the EXCR1 and
EXCR2 exit criteria?
K3 2 credits
Select the answer
1 correct answer
A.
4
B.
3
C.
2
D.
1
Looking for more questions?Buy now

ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Practice test unlocks all online simulator questions

Thank you for choosing the free version of the ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) practice test! Further deepen your knowledge on iSQI Simulator; by unlocking the full version of our ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Simulator you will be able to take tests with over 64 constantly updated questions and easily pass your exam. 98% of people pass the exam in the first attempt after preparing with our 64 questions.

BUY NOW

What to expect from our ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) practice tests and how to prepare for any exam?

The ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Simulator Practice Tests are part of the iSQI Database and are the best way to prepare for any ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) exam. The ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) practice tests consist of 64 questions and are written by experts to help you and prepare you to pass the exam on the first attempt. The ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) database includes questions from previous and other exams, which means you will be able to practice simulating past and future questions. Preparation with ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Simulator will also give you an idea of the time it will take to complete each section of the ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) practice test . It is important to note that the ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Simulator does not replace the classic ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) study guides; however, the Simulator provides valuable insights into what to expect and how much work needs to be done to prepare for the ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) exam.

BUY NOW

ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Practice test therefore represents an excellent tool to prepare for the actual exam together with our iSQI practice test . Our ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Simulator will help you assess your level of preparation and understand your strengths and weaknesses. Below you can read all the quizzes you will find in our ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Simulator and how our unique ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Database made up of real questions:

Info quiz:

  • Quiz name:ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK)
  • Total number of questions:64
  • Number of questions for the test:50
  • Pass score:80%

You can prepare for the ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) exams with our mobile app. It is very easy to use and even works offline in case of network failure, with all the functions you need to study and practice with our ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Simulator.

Use our Mobile App, available for both Android and iOS devices, with our ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Simulator . You can use it anywhere and always remember that our mobile app is free and available on all stores.

Our Mobile App contains all ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) practice tests which consist of 64 questions and also provide study material to pass the final ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) exam with guaranteed success. Our ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) database contain hundreds of questions and iSQI Tests related to ISTQB Certified Tester Advanced Level - Test Manager (CTAL-TM_UK) Exam. This way you can practice anywhere you want, even offline without the internet.

BUY NOW