The new flashcard feature is useful to memorize questions.
?Change your study mode
At any time, you can change the study mode, and alternate between the practice mode and the exam mode. In practice mode, you can configure for example the number of questions or tests, and other parameters to help you study.
Randomized | 10 Questions per Test | 20 Minutes | 70% to pass|
To re-configure your study mode again and change - for example - the number of tests, whether you have random questions and all other configuration parameters.
?Simulator Configuration
Auto-scroll: You can use the automatic scrolling of the questionnaire that occurs as soon as you answer one or all of the answers to a question correctly. Auto scrolling is activated if you answer a single answer, or as soon as you answer all the mandatory answers. Learning Mode: During learning mode you can get a real time result for your answer.
Free Test
Question: / 10
20:00Min. left
?Restart the current test
To restart the current test by clearing all your answers and the time used up to now. Warning: all answers will be lost.
Question: / 10
4.9(496 Votes)
Quiz
Question 1/101/10
A customer moves in to a premise and requests electricity service starting on June 7. According to the schedule records, the scheduled meter reading date is June 29, the scheduled billing date is July 1, and the allocation date for billing is June 30. Given that batch billing is executed every night with all portions included, what is the first day the customer's contract could be billed?
Select the answer:Select the answer
1 correct answer
A.
July 1
B.
June 30
C.
June 7
D.
June 29
The correct answer is A. July 1. The scheduled billing date is the date on which the contract is due to be billed. The other dates support that billing cycle but do not replace the billing date: - June 7 is the service start date. It establishes when the customer’s service begins, not when the first bill is produced. - June 29 is the scheduled meter reading date. The reading provides the consumption information needed for billing. - June 30 is the allocation date. It relates to assigning or preparing the billing items for processing; it is not the scheduled billing date. - July 1 is the scheduled billing date. Since nightly batch billing includes all portions, the contract can be included in the batch on that date. Therefore, the first day the contract could be billed is July 1.
Right Answer: A
Quiz
Question 2/102/10
On May 15, you try to process dunning for an account with an issue date of May 10. Why does dunning fail to produce a result?
Select the answer:Select the answer
1 correct answer
A.
A dunning block which expired on May 13 was set on the contract account.
B.
A dunning block which expired on May 13 was set on the business partner.
C.
A dunning block which began on May 13 was set on the business partner.
D.
A dunning block which began on May 13 was set on the contract account.
Correct answer: A. A dunning block that expired on May 13 was set on the contract account. The dunning run is processed on May 15, but its issue date is May 10. Dunning eligibility is evaluated using the relevant issue date, not simply the day the run is executed. The contract-account block was still valid on May 10, so the account was blocked from dunning for that run. Its expiry on May 13 does not change the fact that it was active on the issue date. The other options do not produce the same result in this scenario: - B places the block on the business partner rather than on the contract account. - C and D describe blocks that begin on May 13. Those blocks were not yet active on the May 10 issue date. So, even though the block had expired by the time the run was processed, it was active on the issue date and prevented dunning from producing a result.
Right Answer: A
Quiz
Question 3/103/10
Which object can be used in monitoring (EL31) to view meter reading results?
Select the answer:Select the answer
1 correct answer
A.
Contract
B.
Device location
C.
Connection object
D.
Contract account
The correct answer is A. Contract. In SAP Utilities, monitoring transaction EL31 can be used to view meter-reading results by selecting a contract. The contract identifies the customer’s utility agreement and is associated with the relevant service and meter-reading data, so it can be used to find the results for that customer relationship. The other options are not the object asked for in this EL31 selection: - Device location identifies where equipment is installed. - Connection object represents the property or premises being supplied. - Contract account is primarily used for billing and payment-related activities. Therefore, select the contract to view meter-reading results in EL31.
Right Answer: A
Quiz
Question 4/104/10
Which criteria are used to group the underlying FICA documents for transfer to General Ledger Accounting? (Choose three)
Select multiple answer: (Choose 3)Select the answer
3 correct answers
A.
Creation date
B.
Currency
C.
Transaction
D.
Segment
E.
Company code
The correct answers are B, D, and E: Currency, Segment, and Company code. When documents from Contract Accounts Receivable and Payable (FI-CA) are transferred to General Ledger Accounting, they are grouped so that the resulting General Ledger postings are compatible with the relevant accounting and reporting dimensions: - Currency: Documents with different currencies are kept in separate groups because amounts in different currencies cannot be combined into a single currency-based posting. - Segment: Documents are grouped by segment so that the resulting postings preserve segment-level reporting and meet the required balancing rules. - Company code: Documents are grouped by company code because each company code represents a separate accounting entity, and its postings must be recorded in that company code. Why the other options are not correct: - Creation date is not one of the grouping criteria specified here. A document’s date may affect posting or reporting, but it does not determine this grouping. - Transaction is not one of the applicable criteria in this question. The grouping is based on the accounting dimensions listed above, not simply on the FI-CA transaction.
Right Answer: B, D, E
Quiz
Question 5/105/10
Which processes can be directly called within the account display transaction? (Choose three)
Select multiple answer: (Choose 3)Select the answer
3 correct answers
A.
Change contract
B.
Display returns history
C.
Mass change
D.
Create budget billing plan
E.
Display installation
The correct answers are A, B, and C. The account display transaction provides direct access to these processes: A. Change contract. You can navigate from the account display to change the contract associated with the account. B. Display returns history. The transaction allows you to view the account’s history of returned payments. C. Mass change. You can start the mass-change process from the account display to update relevant account data in bulk. D. Create budget billing plan is not a direct call from the account display transaction. Creating a plan is handled through the relevant budget-billing process. E. Display installation is also not a direct call from this transaction. Installation details are accessed through an installation-specific display function. These options describe what can be launched directly from the account display, not whether the other tasks can be performed elsewhere in the system.
Right Answer: A, B, C
Quiz
Question 6/106/10
Which of the following must exist before an agent can create an automatic billing document?
Select the answer:Select the answer
1 correct answer
A.
Validated meter reading result
B.
Posted payment
C.
Billable billing order
D.
Active budget billing plan
The correct answer is C. Billable billing order. An automatic billing document can be created only when there is a billing order that is ready for billing. The order provides the billing process with the relevant account and service information and indicates that the transaction can proceed. A. Validated meter reading result — A validated reading may be needed for some types of billing, but it is not universally required; billing may use an estimated or otherwise available consumption value. B. Posted payment — Payment happens after a bill has been issued. It is not a prerequisite for creating the billing document. D. Active budget billing plan — A budget billing plan is optional and applies only to certain customers or arrangements. It is not required for every billing document.
Right Answer: C
Quiz
Question 7/107/10
A tariff requires that for the same contract account, the consumption from the water meter is used to bill the water consumption charge and the waste water consumption charge. How can the water meter be installed to meet this tariff requirement?
Select the answer:Select the answer
1 correct answer
A.
Technically installed to waste installation; billing installed to water installation
B.
Fully installed to water installation; technically installed to waste water installation
C.
Fully installed to water installation; billing installed to waste water installation
D.
Technically installed to water installation; billing installed to waste water installation
The correct answer is C: Fully installed to the water installation; billing installed to the wastewater installation. The meter is physically and technically associated with the water installation, because it measures the supplied water. It is also assigned for billing to the wastewater installation, so the same meter consumption can be used to calculate the wastewater consumption charge as well as the water consumption charge. Both charges can therefore be billed for the same contract account using the water meter’s reading. The other options do not provide the required combination: A assigns the technical and billing relationships in the opposite direction; B places the meter technically on the wastewater installation; and D gives the wastewater billing assignment but does not specify that the meter is fully installed on the water installation.
Right Answer: C
Quiz
Question 8/108/10
You enter a meter reading manually and receive a message informing you that the reading failed a relative tolerance validation. What type of meter reading validation is this?
Select the answer:Select the answer
1 correct answer
A.
Meter reading control validation
B.
Fixed validation
C.
Independent validation
D.
Dependent validation
The correct answer is C. Independent validation. A relative tolerance validation checks whether the entered reading or the resulting consumption falls within an allowed range expressed relative to an expected value. If the reading is outside that range, the system reports a validation failure. It is classified as independent because it is a validation rule applied on its own, rather than one that runs only because another validation failed. The word “independent” describes how the validation is categorized; it does not necessarily mean the check ignores all reading or consumption context. Why the other options are not correct: A. Meter reading control validation refers to a different kind of check, typically involving control readings or meter-reading controls. B. Fixed validation uses fixed limits or conditions, rather than the relative tolerance check described here. D. Dependent validation is linked to another validation or its result. A relative tolerance validation is not classified this way.
Right Answer: C
Quiz
Question 9/109/10
What is the required technical master data for the SAP IS-U move-in?
Select the answer:Select the answer
1 correct answer
A.
• Connection object • Installation • Premise
B.
• Contract account • Installation • Premise
C.
• Contract • Installation • Premise
D.
• Connection object • Installation • Device
The correct answer is A: Connection object, Installation, and Premise. In SAP IS-U, a move-in assigns a customer to the relevant supply location and its technical setup. The required technical master data includes: - Connection object: The building or physical location connected to the utility network. - Premise: The specific unit or area at that location where the customer receives utility services. - Installation: The technical grouping of devices and service-related data used to supply and measure the utility at the premise. The other options include commercial data or omit a required technical object. A contract account is commercial master data, and a contract is created or associated as part of the customer’s utility relationship rather than being one of the required technical master-data objects. A device may be part of the installation, but it does not replace the premise or connection object in the required set.
Right Answer: A
Quiz
Question 10/1010/10
A financial clerk is posting an FI-CA document. Which scenarios can be posted? (Choose three)
Select multiple answer: (Choose 3)Select the answer
3 correct answers
A.
The document has statistical general ledger items totaling $25.
B.
The document has one statistical business partner item totaling $25.
C.
The document has two business partner items totaling $25 and one general ledger item totaling $25.
D.
The document has two business partner items totaling $25 and two general ledger items totaling $25.
E.
The document has two business partner items totaling $0 and one general ledger item totaling $25.
The correct answers are B, C, and D. FI-CA documents must contain a valid business partner item, and ordinary business partner and G/L postings must balance. The number of line items does not matter; the relevant issue is whether the document has a valid posting structure and balances. A. Not valid. The document contains only statistical G/L items and no business partner item. A statistical G/L item does not replace the required business partner item. B. Valid. A statistical business partner item can be posted on its own. Because it is statistical, it does not require a corresponding G/L item. C. Valid. The business partner items total $25, matching the $25 G/L item. The document balances. D. Valid. The two business partner items total $25, and the two G/L items also total $25. Multiple items on either side are allowed as long as the posting balances. E. Not valid. The business partner items total $0, while the G/L item totals $25. The amounts do not balance.
C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam Practice test unlocks all online simulator questions
Thank you for choosing the free version of the C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam practice test! Further deepen your knowledge on SAP Simulator; by unlocking the full version of our C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam Simulator you will be able to take tests with over 80 constantly updated questions and easily pass your exam. 98% of people pass the exam in the first attempt after preparing with our 80 questions.
What to expect from our C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam practice tests and how to prepare for any exam?
The C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam Simulator Practice Tests are part of the SAP Database and are the best way to prepare for any C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam exam. The C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam practice tests consist of 80 questions and are written by experts to help you and prepare you to pass the exam on the first attempt. The C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam database includes questions from previous and other exams, which means you will be able to practice simulating past and future questions. Preparation with C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam Simulator will also give you an idea of the time it will take to complete each section of the C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam practice test . It is important to note that the C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam Simulator does not replace the classic C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam study guides; however, the Simulator provides valuable insights into what to expect and how much work needs to be done to prepare for the C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam exam.
C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam Practice test therefore represents an excellent tool to prepare for the actual exam together with our SAP practice test . Our C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam Simulator will help you assess your level of preparation and understand your strengths and weaknesses. Below you can read all the quizzes you will find in our C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam Simulator and how our unique C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam Database made up of real questions:
Info quiz:
Quiz name:C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam
Total number of questions:80
Number of questions for the test:50
Pass score:80%
You can prepare for the C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam exams with our mobile app. It is very easy to use and even works offline in case of network failure, with all the functions you need to study and practice with our C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam Simulator.
Use our Mobile App, available for both Android and iOS devices, with our C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam Simulator . You can use it anywhere and always remember that our mobile app is free and available on all stores.
Our Mobile App contains all C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam practice tests which consist of 80 questions and also provide study material to pass the final C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam exam with guaranteed success.
Our C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam database contain hundreds of questions and SAP Tests related to C_FSUTIL_60: SAP Certified Associate - Utilities with SAP ERP Exam Exam. This way you can practice anywhere you want, even offline without the internet.