The new flashcard feature is useful to memorize questions.
?Change your study mode
At any time, you can change the study mode, and alternate between the practice mode and the exam mode. In practice mode, you can configure for example the number of questions or tests, and other parameters to help you study.
Randomized | 10 Questions per Test | 20 Minutes | 70% to pass|
To re-configure your study mode again and change - for example - the number of tests, whether you have random questions and all other configuration parameters.
?Simulator Configuration
Auto-scroll: You can use the automatic scrolling of the questionnaire that occurs as soon as you answer one or all of the answers to a question correctly. Auto scrolling is activated if you answer a single answer, or as soon as you answer all the mandatory answers. Learning Mode: During learning mode you can get a real time result for your answer.
Free Test
Question: / 10
20:00Min. left
?Restart the current test
To restart the current test by clearing all your answers and the time used up to now. Warning: all answers will be lost.
Question: / 10
4.7(990 Votes)
Quiz
Question 1/101/10
A project was created with a shared configuration. Which two configurations were shared? (Choose two.
Select multiple answer: (Choose 2)Select the answer
2 correct answers
A.
component lead assignments
B.
versions
C.
transition screens
D.
project role membership
E.
project permissions
When a project is created with a shared configuration, it inherits the configurations of an existing project. This includes the workflow, issue types, screens, fields, permissions, notifications, and schemes associated with them. However, the component lead assignments and versions are specific to each project and are not shared. Therefore, the correct answer is C and E. Reference: Creating a project, Configuring projects
Right Answer: C, E
Quiz
Question 2/102/10
You are a project administrator of DEV. Omar is a Jira administrator. Identify two project settings that Omar can update in DEV but you cannot. (Choose two.)
Select multiple answer: (Choose 2)Select the answer
2 correct answers
A.
Notification scheme
B.
Project shortcuts
C.
Key
D.
Description
E.
Name
F.
Versions
As a project administrator of DEV, you can update some project settings such as project shortcuts, description, name, and versions. However, you cannot update the notification scheme or the key of the project, as these are global settings that require Jira administrator permissions. Therefore, the correct answer is A and C. Reference: Managing project permissions, Managing project notifications, Changing the project key
Right Answer: A, C
Quiz
Question 3/103/10
A Jira administrator just created a new project based on the "Task management" project template. Which Jira feature is enabled in this project by default?
Select the answer:Select the answer
1 correct answer
A.
Epic issue type
B.
ranking of standard issue types
C.
Issue analysis reports
D.
Release Hub
The “Task management” project template is designed for managing simple tasks and tracking progress. By default, this template enables ranking of standard issue types, which allows you to order issues by priority on a board. The other features mentioned in the options are not enabled by default in this template. Therefore, the correct answer is B. Reference: Creating a project, Ranking an issue
Right Answer: B
Quiz
Question 4/104/10
The team requests that you update the name of your project. What impact will this have on Jira?
Select the answer:Select the answer
1 correct answer
A.
The URL for issues will change.
B.
The project key will change.
C.
Issue filters may need to be updated.
D.
Issue search will not find issues from that project until Jira is re indexed.
Updating the name of your project will not affect the URL for issues, as they are based on the project key, not the name. The project key will also remain unchanged unless you explicitly change it. Issue search will still find issues from that project regardless of the name change. However, issue filters may need to be updated if they use the project name as a criterion. Therefore, the correct answer is C. Reference: Editing a project’s details, Changing the project key, Searching for issues using filters
Right Answer: C
Quiz
Question 5/105/10
You are moving an epic between projects that share an issue type scheme. Which issues are moved along with the epic5
Select the answer:Select the answer
1 correct answer
A.
all standard issues in the epic
B.
all standard and sub-task issues in the epic
C.
only Story issues in the epic
D.
all sub-tasks of the epic itself
E.
all issues linked to the epic through issue links
When you move an epic between projects that share an issue type scheme, all standard issues in the epic are moved along with it. This means that any issue type that is not a sub-task or an epic will be moved to the new project. Sub-task issues in the epic will not be moved unless their parent issues are also in the epic. Story issues in the epic will be moved only if they are standard issue types, not sub-tasks. Issues linked to the epic through issue links will not be moved as they are not part of the epic hierarchy. Therefore, the correct answer is A. Reference: Moving an issue, Working with epics
Right Answer: A
Quiz
Question 6/106/10
Which statement is definitely true about sub-tasks being used on a Scrurn board?
Select the answer:Select the answer
1 correct answer
A.
Sub-task estimations are rolled up and displayed as the Original Estimate on the parent card.
B.
Sub-tasks can only be created by board administrators
C.
Sub-tasks can be displayed as cards in the Active sprints view.
D.
Sub-tasks can be displayed as cards in the Backlog view.
E.
Sub-tasks will automatically get resolved when the parent is moved to the Done column.
Sub-tasks are a type of issue that can be used to break down a parent issue into smaller and more manageable pieces. Sub-tasks can be displayed as cards in the Active sprints view of a Scrum board, which allows you to track their progress and status. However, sub-task estimations are not rolled up and displayed on the parent card, as they use a different field than the parent issue. Sub-tasks can be created by anyone who has the Create Issue permission in the project, not only by board administrators. Sub-tasks cannot be displayed as cards in the Backlog view, as they are only visible under their parent issues. Sub-tasks will not automatically get resolved when the parent is moved to the Done column, as they have their own workflow transitions and conditions. Therefore, the correct answer is C. Reference: [Working with sub-tasks], [Configuring columns]
Right Answer: C
Quiz
Question 7/107/10
A project uses several issue Types that have different workflows. Sam can only see some of the issues on the project's Kanban board but sees all of them in the issue search. Identify a possible reason.
Select the answer:Select the answer
1 correct answer
A.
board permissions
B.
column mapping
C.
issue-level security
D.
workflow conditions
A possible reason why Sam can only see some of the issues on the project’s Kanban board but sees all of them in the issue search is that the column mapping of the board does not include all the statuses of the different workflows used by the issue types. Column mapping determines which statuses are mapped to which columns on a board, and only issues with mapped statuses are displayed on the board. If an issue type has a workflow with a status that is not mapped to any column, then it will not appear on the board. Board permissions, issue-level security, and workflow conditions do not affect the visibility of issues on a board, as they apply to both the board and the issue search. Therefore, the correct answer is B. Reference: [Configuring columns], [Configuring workflows]
Right Answer: B
Quiz
Question 8/108/10
Your team uses a custom field of type Labels to track keywords associated with incoming requests. Issues can have multiple keywords, and new keywords can be added at any time. They want to see keywords displayed prominently when viewing all cards on a board. Which configuration meets this need?
Select the answer:Select the answer
1 correct answer
A.
card layout
B.
swimlanes
C.
card colours
D.
issue detail view
The best configuration to meet the team’s need of displaying keywords prominently when viewing all cards on a board is card layout. Card layout allows you to customize what fields are shown on each card on a board, and you can choose to show any custom field of type Labels on the cards. Swimlanes are used to group issues into horizontal lanes based on certain criteria, such as assignee, priority, or query, but they do not show labels on each card. Card colours are used to highlight issues based on certain attributes, such as issue type, priority, or query, but they do not show labels on each card either. Issue detail view is used to show more information about an issue when you select it on a board, but it does not affect how cards are displayed on the board. Therefore, the correct answer is A. Reference: [Configuring card layout], [Configuring swimlanes], [Configuring card colours], [Using boards]
Right Answer: A
Quiz
Question 9/109/10
Sam and Jo are product managers responsible for two separate products. Each product has its own Jira project and a corresponding Scrum board. Management requests an integration between the products. Sam and Jo decide to create all the integration-related issues in Sams project and label them integration". Jo updated his Scrum board's saved filter to include the relevant integration issues from Sam's project. Which statement is definitely true?
Select the answer:Select the answer
1 correct answer
A.
All integration issues always appear on top of Jo's backlog.
B.
Changes to the rank of integration issues on Jo's board are reflected on Sam's board.
C.
Jo is unable to rank integration issues created by Sam.
D.
Sam is unable to transition integration issues that were ranked by Jo.
E.
Integration issues can only be ranked on Sam's board.
The statement that is definitely true is that changes to the rank of integration issues on Jo’s board are reflected on Sam’s board. This is because ranking is a global attribute that affects how issues are ordered across projects and boards based on their relative priority. When Jo updates his Scrum board’s saved filter to include integration issues from Sam’s project, he can rank them along with his own issues on his board. These changes will also affect how these issues are ranked on Sam’s board, as they share the same rank field value. The other statements are not necessarily true or false, as they depend on other factors such as permissions, workflow configurations, or board settings. Therefore, the correct answer is B. Reference: [Ranking an issue], [Configuring filters]
Right Answer: B
Quiz
Question 10/1010/10
A team currently uses a single project to track both features and tasks. They will be adopting aqile practices, as follows: • Features will be developed during three week iterations. • Tasks will be handled based on priority and rank and released incrementally as needed. they want to use agile boards with minimal disruption to their current configuration. Which solution will meet their requirements?
Select the answer:Select the answer
1 correct answer
A.
a Kanban board in the current project with separate swimlanes per issue type
B.
two Scrum boards for the current project, one for each issue type
C.
a Scrum board in the current project with two quick fillers to show each issue type separately
D.
a second project for tasks with a shared configuration and separate boards per project
E.
a Kanban board for tasks and a Scrum board for features in the current project
The solution that will meet the team’s requirements of using agile boards with minimal disruption to their current configuration is to use a Kanban board for tasks and a Scrum board for features in the current project. This way, they can use different agile methodologies for different issue types without creating a new project or changing their existing configuration. They can use a Kanban board for tasks to handle them based on priority and rank and release them incrementally as needed. They can use a Scrum board for features to develop them during three week iterations with sprints and backlogs. The other solutions are either not feasible or not optimal for their needs. Therefore, the correct answer is E. Reference: [Creating a board], [Using a Scrum board], [Using a Kanban board]
ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification Practice test unlocks all online simulator questions
Thank you for choosing the free version of the ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification practice test! Further deepen your knowledge on ATLASSIAN Simulator; by unlocking the full version of our ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification Simulator you will be able to take tests with over 75 constantly updated questions and easily pass your exam. 98% of people pass the exam in the first attempt after preparing with our 75 questions.
What to expect from our ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification practice tests and how to prepare for any exam?
The ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification Simulator Practice Tests are part of the ATLASSIAN Database and are the best way to prepare for any ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification exam. The ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification practice tests consist of 75 questions and are written by experts to help you and prepare you to pass the exam on the first attempt. The ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification database includes questions from previous and other exams, which means you will be able to practice simulating past and future questions. Preparation with ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification Simulator will also give you an idea of the time it will take to complete each section of the ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification practice test . It is important to note that the ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification Simulator does not replace the classic ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification study guides; however, the Simulator provides valuable insights into what to expect and how much work needs to be done to prepare for the ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification exam.
ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification Practice test therefore represents an excellent tool to prepare for the actual exam together with our ATLASSIAN practice test . Our ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification Simulator will help you assess your level of preparation and understand your strengths and weaknesses. Below you can read all the quizzes you will find in our ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification Simulator and how our unique ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification Database made up of real questions:
Info quiz:
Quiz name:ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification
Total number of questions:75
Number of questions for the test:50
Pass score:80%
You can prepare for the ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification exams with our mobile app. It is very easy to use and even works offline in case of network failure, with all the functions you need to study and practice with our ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification Simulator.
Use our Mobile App, available for both Android and iOS devices, with our ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification Simulator . You can use it anywhere and always remember that our mobile app is free and available on all stores.
Our Mobile App contains all ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification practice tests which consist of 75 questions and also provide study material to pass the final ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification exam with guaranteed success.
Our ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification database contain hundreds of questions and ATLASSIAN Tests related to ACP-610: Atlassian Managing Jira Projects for Data Center and Server Certification Exam. This way you can practice anywhere you want, even offline without the internet.