The new flashcard feature is useful to memorize questions.
?Change your study mode
At any time, you can change the study mode, and alternate between the practice mode and the exam mode. In practice mode, you can configure for example the number of questions or tests, and other parameters to help you study.
Randomized | 10 Questions per Test | 20 Minutes | 70% to pass|
To re-configure your study mode again and change - for example - the number of tests, whether you have random questions and all other configuration parameters.
?Simulator Configuration
Auto-scroll: You can use the automatic scrolling of the questionnaire that occurs as soon as you answer one or all of the answers to a question correctly. Auto scrolling is activated if you answer a single answer, or as soon as you answer all the mandatory answers. Learning Mode: During learning mode you can get a real time result for your answer.
Free Test
Question: / 10
20:00Min. left
?Restart the current test
To restart the current test by clearing all your answers and the time used up to now. Warning: all answers will be lost.
Question: / 10
4.6(117 Votes)
Quiz
Question 1/101/10
Darryl is a Project Manager at CCC Company and has been tasked to introduce a change. The change will be brought about incrementally and Darryl has been chosen to lead on this due to his expertise in the subject matter. The Company is hoping that due to Darryl's credibility, the staff at CCC will embrace the proposed changes. What type of 'change agent' is Darryl?
Select the answer:Select the answer
1 correct answer
A.
transformer
B.
specialist
C.
enforcer
D.
independent
In CIPS L5M8, change agents include types such as specialist (selected for subject-matter expertise and credibility), enforcer (uses authority), transformer (visionary catalyst), and independent (external/neutral). Darryl is chosen because of his expertise and credibility to bring colleagues on side—this aligns with the specialist profile. Reference: CIPS L5M8 Study Guide, p.133.
Right Answer: B
Quiz
Question 2/102/10
Participative Evolution is a change model which requires which of the following in order to be effective?
Select the answer:Select the answer
1 correct answer
A.
tight timescales
B.
political capital
C.
consultative style of leadership
D.
large budget
Participative evolution entails incremental change with employee support. Effective application requires a consultative leadership style to involve and engage people so they back the change. Tight timescales or large budgets are not defining necessities. Reference: CIPS L5M8 Study Guide, p.91.
Right Answer: C
Quiz
Question 3/103/10
Zoo Ltd uses Lean manufacturing techniques and Six Sigma in order to improve process efficiencies. What type of changes would you expect to see at this organisation?
Select the answer:Select the answer
1 correct answer
A.
evolution
B.
adaptation (spelling corrected from “adaption”)
C.
revolution
D.
reconstruction
Lean and Six Sigma typically drive incremental, continuous improvements to processes. L5M8 categorises this as adaptation—ongoing, small-scale changes rather than radical overhauls. Reference: CIPS L5M8 Study Guide, p.93.
Right Answer: B
Quiz
Question 4/104/10
Which of the following is an example of an exogenous disruption that stimulates the requirement for change within an organisation?
Select the answer:Select the answer
1 correct answer
A.
company restructure
B.
pressure to increase revenue
C.
increase in tax rate
D.
change of management
An exogenous driver of change originates outside the organisation. A tax rate increase is an external policy change; the other options are internal. Reference: CIPS L5M8 Study Guide, p.104.
Right Answer: C
Quiz
Question 5/105/10
What is the name of the evolutionary stage in a company's development in which an organisation overcomes the burden of bureaucracy through the use of interpersonal communication and the introduction of a new organisational design such as a matrix structure?
Select the answer:Select the answer
1 correct answer
A.
direction evolution
B.
collaboration evolution
C.
co-ordination evolution
D.
creative evolution
In Greiner’s growth phases, the collaboration phase addresses bureaucratic overload using teamwork, interpersonal collaboration, and flexible structures (e.g., matrix). It follows creative → direction → delegation → coordination → collaboration. Reference: CIPS L5M8 Study Guide, p.105.
Right Answer: B
Quiz
Question 6/106/10
Baby Socks Ltd is a retailer which is currently growing and expanding. Originally a start-up, the company is now transitioning into a more mature and functional organisation. More staff have been hired and lower-level managers will now need to take accountability for some business decisions. As the company evolves into the new structure, which of the following is likely to be a cause of crisis at the organisation?
Select the answer:Select the answer
1 correct answer
A.
leadership
B.
red tape
C.
intellectual property
D.
wider marketplace
Moving from creative (entrepreneurial) to direction (more formalised) triggers a leadership crisis in Greiner’s model—founders need to adopt more formal management or introduce professional managers. Reference: CIPS L5M8 Study Guide, p.106.
Right Answer: A
Quiz
Question 7/107/10
Benito is a Team Leader within a large manufacturing organisation which has recently gone through a company-wide restructure. As well as changes to staffing levels, new Operating Procedures have been brought in and Benito has noticed that his team has lost morale and doesn't understand the motivations behind the changes. Which of the following tools would be useful for Benito to use with his team?
Select the answer:Select the answer
1 correct answer
A.
SWOT analysis
B.
STEEPLE analysis
C.
Force Field Analysis
D.
Multiple Cause Diagram
A Multiple Cause Diagram helps teams visualise complex, interconnected factors, encouraging open discussion about drivers behind changes and areas requiring action. This suits a context with morale issues and confusion about causes. Reference: CIPS L5M8 Study Guide, p.116.
Right Answer: D
Quiz
Question 8/108/10
A large unpredicted event has occurred in the external environment which has affected Company X. Which of the following change responses would be most appropriate to this situation?
Select the answer:Select the answer
1 correct answer
A.
incremental–reactive change
B.
incremental–proactive change
C.
proactive–transformational change
D.
reactive–transformational change
A large, already-occurred external event calls for reactive response; given its magnitude, the change must be transformational rather than incremental. Reference: CIPS L5M8 Study Guide, p.124.
Right Answer: D
Quiz
Question 9/109/10
Which of the following statements about individuals' resistance to change are TRUE? Select THREE
Select multiple answer: (Choose 3)Select the answer
3 correct answers
A.
change is experienced equally by individuals
B.
an individual with high levels of self-efficacy will likely fear change
C.
resistance to change is driven by negative emotions such as fear
D.
resistance to change can include passive actions such as not replying to emails
E.
managers should support individuals through the process of change
Reactions to change vary by person; low (not high) self-efficacy correlates with fear/avoidance. True elements include: negative emotions (e.g., fear) often drive resistance; resistance may be passive (avoidance, delay); managers should support and guide individuals through the change journey. Reference: CIPS L5M8 Study Guide, pp.126–127.
Right Answer: C, D, E
Quiz
Question 10/1010/10
Freeman defines six stakeholder categories who are able to influence the success of a project. Select THREE
Select multiple answer: (Choose 3)Select the answer
3 correct answers
A.
owners
B.
creditors
C.
suppliers
D.
managers
E.
government
Freeman’s typology identifies categories such as owners, managers, employees, suppliers, customers, and local community as primary stakeholders with influence. From the list provided, owners, suppliers, managers align with that set. Reference: CIPS L5M8 Study Guide, p.5.
L5M8: CIPS Project and Change Management Practice test unlocks all online simulator questions
Thank you for choosing the free version of the L5M8: CIPS Project and Change Management practice test! Further deepen your knowledge on CIPS Simulator; by unlocking the full version of our L5M8: CIPS Project and Change Management Simulator you will be able to take tests with over 88 constantly updated questions and easily pass your exam. 98% of people pass the exam in the first attempt after preparing with our 88 questions.
What to expect from our L5M8: CIPS Project and Change Management practice tests and how to prepare for any exam?
The L5M8: CIPS Project and Change Management Simulator Practice Tests are part of the CIPS Database and are the best way to prepare for any L5M8: CIPS Project and Change Management exam. The L5M8: CIPS Project and Change Management practice tests consist of 88 questions and are written by experts to help you and prepare you to pass the exam on the first attempt. The L5M8: CIPS Project and Change Management database includes questions from previous and other exams, which means you will be able to practice simulating past and future questions. Preparation with L5M8: CIPS Project and Change Management Simulator will also give you an idea of the time it will take to complete each section of the L5M8: CIPS Project and Change Management practice test . It is important to note that the L5M8: CIPS Project and Change Management Simulator does not replace the classic L5M8: CIPS Project and Change Management study guides; however, the Simulator provides valuable insights into what to expect and how much work needs to be done to prepare for the L5M8: CIPS Project and Change Management exam.
L5M8: CIPS Project and Change Management Practice test therefore represents an excellent tool to prepare for the actual exam together with our CIPS practice test . Our L5M8: CIPS Project and Change Management Simulator will help you assess your level of preparation and understand your strengths and weaknesses. Below you can read all the quizzes you will find in our L5M8: CIPS Project and Change Management Simulator and how our unique L5M8: CIPS Project and Change Management Database made up of real questions:
Info quiz:
Quiz name:L5M8: CIPS Project and Change Management
Total number of questions:88
Number of questions for the test:50
Pass score:80%
You can prepare for the L5M8: CIPS Project and Change Management exams with our mobile app. It is very easy to use and even works offline in case of network failure, with all the functions you need to study and practice with our L5M8: CIPS Project and Change Management Simulator.
Use our Mobile App, available for both Android and iOS devices, with our L5M8: CIPS Project and Change Management Simulator . You can use it anywhere and always remember that our mobile app is free and available on all stores.
Our Mobile App contains all L5M8: CIPS Project and Change Management practice tests which consist of 88 questions and also provide study material to pass the final L5M8: CIPS Project and Change Management exam with guaranteed success.
Our L5M8: CIPS Project and Change Management database contain hundreds of questions and CIPS Tests related to L5M8: CIPS Project and Change Management Exam. This way you can practice anywhere you want, even offline without the internet.