The new flashcard feature is useful to memorize questions.
?Change your study mode
At any time, you can change the study mode, and alternate between the practice mode and the exam mode. In practice mode, you can configure for example the number of questions or tests, and other parameters to help you study.
Randomized | 10 Questions per Test | 20 Minutes | 70% to pass|
To re-configure your study mode again and change - for example - the number of tests, whether you have random questions and all other configuration parameters.
?Simulator Configuration
Auto-scroll: You can use the automatic scrolling of the questionnaire that occurs as soon as you answer one or all of the answers to a question correctly. Auto scrolling is activated if you answer a single answer, or as soon as you answer all the mandatory answers. Learning Mode: During learning mode you can get a real time result for your answer.
Free Test
Question: / 10
20:00Min. left
?Restart the current test
To restart the current test by clearing all your answers and the time used up to now. Warning: all answers will be lost.
Question: / 10
4.7(125 Votes)
Quiz
Question 1/101/10
Which one is a product risk associated with the air quality management system?
Select the answer:Select the answer
1 correct answer
A.
The system required to monitor oxygen levels may be more expensive than those required to monitor air temperatures.
B.
SubsInc may need to recruit extra developers and testers to deliver the project on time.
C.
Oxygen levels may reach dangerously low levels.
D.
Extreme temperatures may lead to heat exhaustion of personnel.
The correct answer is C. Oxygen levels may reach dangerously low levels. A product risk is a risk that affects the quality, performance, or safety of the product itself. In this case, the air quality management system is intended to monitor and manage environmental conditions, so a failure in the system could directly affect the air quality it is supposed to control. Option C describes a risk related to the product’s function: if the system does not work properly, oxygen levels may fall to dangerously low levels. That is a product risk because it concerns the impact of the system on the environment it is managing. Why the other options are not correct: A. This is mainly a cost issue. The system being more expensive is a project/business risk, not a product risk. B. This is a project risk because it concerns staffing and delivery on time. D. This is a possible consequence of extreme temperatures, but it is not the best description of a risk associated with the air quality management system itself. It is less directly tied to the product’s behavior than option C. So, C is the best answer because it directly describes a product-related safety risk.
Right Answer: C
Quiz
Question 2/102/10
Which of the following would be an entry criterion into site acceptance testing for the air quality Questions & Answers PDF P-3 monitoring system?
Select the answer:Select the answer
1 correct answer
A.
That the code written to fulfil the requirement to monitor carbon dioxide levels has been 100% path tested.
B.
That the functional specification accurately reflects requirements R1 and R2.
C.
That the system has been tested at levels of oxygen usage well beyond anticipated personnel levels.
D.
That the requirements for temperature control have been signed-off.
The correct answer is C. That the system has been tested at levels of oxygen usage well beyond anticipated personnel levels. Site acceptance testing, often called SAT, is performed at or near the end of the development process to confirm that the system works correctly in its intended operational environment. An entry criterion for SAT is something that should already have been completed before SAT begins. In this case, the air quality monitoring system must already have been tested under extreme or worst-case operating conditions to show that it can handle situations beyond normal expected use. Why C is correct: - Testing at oxygen usage levels well beyond anticipated personnel levels is a form of stress or robustness testing. - This type of testing is typically done before SAT to ensure the system is safe and reliable under abnormal but plausible conditions. - It is sensible as an entry criterion because SAT should not begin until the system has passed this kind of prerequisite testing. Why the other options are not correct: A. That the code written to fulfil the requirement to monitor carbon dioxide levels has been 100% path tested. - Path testing is a code-level structural test technique. - While useful, it is not usually an entry criterion specifically for site acceptance testing. - SAT focuses more on system behavior in the operational environment than on detailed code coverage. B. That the functional specification accurately reflects requirements R1 and R2. - This is important for validation and requirements traceability, but it is more of a documentation and specification review activity. - It is not a typical prerequisite specifically tied to entering SAT. D. That the requirements for temperature control have been signed-off. - Requirements sign-off is usually part of earlier development and review stages. - Although important, it is not as directly related to readiness for SAT as demonstrating the system has already been tested under extreme oxygen usage conditions. In summary, the best entry criterion for site acceptance testing is the completion of testing under demanding conditions, which is why C is the correct answer.
Right Answer: C
Quiz
Question 3/103/10
Which of the following is an accurate depiction of the hierarchy of test management documentation (where the highest comes first)?
Select the answer:Select the answer
1 correct answer
A.
Test policy-Test strategy-Project test plan-System test plan
B.
Test strategy-Test policy-Project test plan-System test plan
C.
Test policy-Project test plan-Test strategy-System test plan
D.
Project test plan-Test strategy-System test plan-Test policy
The correct answer is A: Test policy - Test strategy - Project test plan - System test plan. Test management documentation is typically organized from the most general, organization-wide level down to the most specific, project- or system-level level. 1. Test policy This is the highest-level document. It defines the overall principles, goals, and approach to testing across the organization. It is usually created at the organizational level and sets the framework for all testing activities. 2. Test strategy This comes next. It explains how the test policy will be applied in practice. It gives a broader approach to testing, usually at the organizational or program level, and may describe standards, techniques, tools, and test design principles. 3. Project test plan This is more specific and focuses on a particular project. It describes the testing scope, objectives, resources, schedule, risks, and deliverables for that project. 4. System test plan This is the most detailed in this hierarchy. It focuses on testing a specific system or subsystem and outlines the exact testing activities to be performed for that level of testing. Why the other options are incorrect: B. Test strategy - Test policy - Project test plan - System test plan This is incorrect because the policy should be above the strategy, not the other way around. C. Test policy - Project test plan - Test strategy - System test plan This is incorrect because the project test plan is more specific than the strategy and should not come before it. D. Project test plan - Test strategy - System test plan - Test policy This is incorrect because it puts the most specific document first and the most general document last, which reverses the proper hierarchy. In summary, the correct order is from general to specific: Test policy -> Test strategy -> Project test plan -> System test plan.
Right Answer: A
Quiz
Question 4/104/10
Which of the following test design techniques would be most suitable for testing that the oxygen is released at the required times?
Select the answer:Select the answer
1 correct answer
A.
Decision Testing.
B.
Statement Testing.
C.
Data flow Testing.
D.
Boundary Value Analysis.
The correct answer is D. Boundary Value Analysis. Why this is the best choice: Boundary Value Analysis is a test design technique used to check behavior at the edges of input ranges or timing conditions, where defects are most likely to occur. In this question, the focus is on verifying that oxygen is released at the required times. Timing requirements often have critical limits or thresholds, so testing just before, at, and just after those required times is the most appropriate approach. Why the other options are less suitable: A. Decision Testing This technique is used to test different decision outcomes, such as if/then/else logic. It is more suitable when you need to verify control flow based on conditions, not timing boundaries. B. Statement Testing This checks whether each executable statement in the code has been run at least once. It is a structural coverage measure, not a technique aimed at verifying timing requirements. C. Data Flow Testing This focuses on the definition and use of variables in the code. It is useful for finding issues related to variable usage, but not for checking whether an action happens at the correct time. Why Boundary Value Analysis fits the question: If oxygen must be released at specific times, the likely problem areas are the time boundaries: - just before the required time - exactly at the required time - just after the required time Testing these boundary points helps confirm that the system behaves correctly when timing is critical. In summary: Because the requirement is about oxygen being released at the required times, the most suitable technique is Boundary Value Analysis.
Right Answer: D
Quiz
Question 5/105/10
When creating the functional specification for the temperature control system, which of the following review types would be most recommended to resolve any issues?
Select the answer:Select the answer
1 correct answer
A.
A walkthrough.
B.
A technical review.
C.
A management review.
D.
A code inspection.
The correct answer is B. A technical review. Here’s why: A functional specification describes what the system should do, including requirements, behavior, interfaces, and constraints. When reviewing this kind of document, the goal is to find and resolve technical issues such as: - unclear or ambiguous requirements - inconsistent behavior descriptions - missing functional details - conflicts between requirements - feasibility concerns - design implications A technical review is specifically suited for this purpose because it is conducted by people with relevant technical knowledge who can evaluate the specification for correctness, completeness, consistency, and feasibility. It is more focused than a management review and more appropriate for requirements/specification issues than a code inspection. Why the other options are less suitable: A. A walkthrough. A walkthrough is usually more informal and led by the author. It is useful for sharing understanding and getting feedback, but it is not the most recommended type when the main goal is to resolve technical issues in a specification. C. A management review. A management review focuses on project progress, resource use, schedules, and overall status rather than detailed technical problems in a functional specification. D. A code inspection. A code inspection is used to review source code, not a functional specification. It is intended to detect defects in the implementation, not in the requirements document. So, for reviewing a functional specification for a temperature control system and resolving issues, the most appropriate choice is a technical review.
Right Answer: B
Quiz
Question 6/106/10
Which of the following are product risks and which are project risks? a.The navigation through some parts of the website may need to be different from others. b.Sprint 1 may not be completed on time, leading to a delay to the start of Sprint 2. c.Text versions of images may not always be possible. d.There may be a need to buy a capture-replay tool for regression testing. key member of the team may leave before the Sprints have been completed.
Select the answer:Select the answer
1 correct answer
A.
a, b and c are product risks, d and e are project risks.
B.
a andc are products risks, b, d and e are project risks.
C.
b, c and e are product risks, a and d are project risks.
D.
a, d and e are product risks, b and c are project risks.
The correct answer is B. Product risks are risks that affect the quality, features, usability, or functionality of the product being built. Project risks are risks that affect the project plan, schedule, resources, or management of the work. Let’s look at each statement: a. The navigation through some parts of the website may need to be different from others. This is a product risk because it concerns how the website will work and behave for users. b. Sprint 1 may not be completed on time, leading to a delay to the start of Sprint 2. This is a project risk because it affects the schedule and progress of the project. c. Text versions of images may not always be possible. This is a product risk because it relates to a product feature or accessibility requirement. d. There may be a need to buy a capture-replay tool for regression testing. This is a project risk because it involves project resources, tools, and cost. e. A key member of the team may leave before the Sprints have been completed. This is a project risk because it affects staffing and delivery capability. So the correct grouping is: Product risks: a and c Project risks: b, d, and e Therefore, the correct answer is B.
Right Answer: B
Quiz
Question 7/107/10
Which stage of the Fundamental Test Process will be most affected by the use of user-stories as defined above?
Select the answer:Select the answer
1 correct answer
A.
Creating a schedule of activities as part of test planning.
B.
Creating test cases as part of test design.
C.
Creating the test environment as part of test execution.
D.
Assessing requirements coverage at the end of each Sprint.
The correct answer is B. Creating test cases as part of test design. User stories are a common way of expressing requirements in Agile development. They usually describe a feature from the user’s perspective and are often intentionally brief and high-level, such as: "As a customer, I want to reset my password so that I can regain access to my account." Because user stories are written in this concise format, they most strongly affect the test design stage of the Fundamental Test Process. In test design, testers analyze requirements and derive test cases from them. User stories become the main input for identifying what should be tested, what scenarios are relevant, and what acceptance criteria can be turned into test cases. Why B is correct: - Test design is where requirements are translated into test conditions and test cases. - User stories provide the basis for understanding expected behavior and acceptance criteria. - Since user stories are often the primary requirements artifact in Agile, they have the greatest impact here. Why the other options are less suitable: A. Creating a schedule of activities as part of test planning. - Scheduling is influenced more by project constraints, team availability, and sprint planning than by the format of requirements. - User stories may affect the amount of work, but not as directly as they affect test design. C. Creating the test environment as part of test execution. - Test environment setup depends on technical and infrastructure needs, not mainly on how requirements are expressed. - User stories may suggest certain environment needs, but this is indirect. D. Assessing requirements coverage at the end of each Sprint. - Coverage assessment is important in Agile, but user stories are not what most affects this activity. - User stories are used to define tests and trace coverage, but the biggest impact is still on creating test cases. Conclusion: User stories mainly influence how testers derive and write test cases, so the best answer is B.
Right Answer: B
Quiz
Question 8/108/10
Which of the following review types would be recommended at the start of each Sprint, for the reason given?
Select the answer:Select the answer
1 correct answer
A.
An inspection, to find errors in the user-stories.
B.
A management review, to check that the user-stories will accurately reflect the rules for accessibility.
C.
A walkthrough of the set of user-stories, to ensure that the developers and testers understand what is to be built.
D.
A technical review of the test plan, to ensure that the developers are aware that they must produce good quality code.
The correct answer is C. A walkthrough of the set of user-stories, to ensure that the developers and testers understand what is to be built. At the start of each Sprint, the main goal is to make sure everyone involved has a shared understanding of the work to be done. User stories define the functionality from the user’s perspective, and they need to be clear enough for developers and testers to understand what is expected before implementation begins. Why C is correct: A walkthrough is an informal review used to explain and discuss work product with relevant stakeholders. In this case, walking through the user stories at the beginning of the Sprint helps the team clarify requirements, identify ambiguities, and ensure developers and testers understand the scope and expected behavior of the features to be built. Why the other options are not correct: A. An inspection, to find errors in the user-stories. An inspection is a more formal review technique focused on detecting defects in a work product. While inspections can be useful, the question asks for the type of review recommended at the start of each Sprint for the given purpose. The primary need here is shared understanding, which is better achieved by a walkthrough. B. A management review, to check that the user-stories will accurately reflect the rules for accessibility. A management review is typically used to monitor progress and evaluate project status or compliance from a managerial perspective. It is not the best fit for ensuring the development team understands what needs to be built. Also, accessibility compliance would usually be verified through requirements analysis and testing, not a management review. D. A technical review of the test plan, to ensure that the developers are aware that they must produce good quality code. A technical review is generally used by peers or technical experts to evaluate a technical work product, such as design or code, for suitability and compliance. Reviewing the test plan would not be the best way to ensure developers understand the user stories, and the stated reason does not match the purpose of a technical review. Summary: The key issue is team understanding at Sprint start. A walkthrough of the user stories is the most appropriate review type because it promotes clarity and alignment among developers and testers.
Right Answer: C
Quiz
Question 9/109/10
Which of the following methods of test estimation would be most appropriate for each Sprint?
Select the answer:Select the answer
1 correct answer
A.
Ask the testers to talk to each other and reach a consensus.
B.
Take 30% of the total development time required for the Sprint.
C.
Conduct a test point analysis on the content and navigation requirements.
D.
Use metrics from the last accessibility project at MSC.
The correct answer is A. Ask the testers to talk to each other and reach a consensus. In Agile and Scrum environments, test estimation for each Sprint is typically done by the people who will actually perform the testing. The goal is to use the team’s collective experience and understanding of the Sprint backlog items to estimate the testing effort realistically. A collaborative discussion among testers helps surface assumptions, identify risks, and agree on the amount of effort needed. Why A is correct: - Test estimation is best done by the testers involved in the work. - A consensus-based discussion allows the team to consider complexity, risk, dependencies, and unknowns. - It fits Agile principles, where estimation is collaborative and based on current Sprint scope. Why the other options are less appropriate: - B. Take 30% of the total development time required for the Sprint. This is a rough rule of thumb, but it is not reliable because testing effort varies widely depending on the type and complexity of the Sprint work. - C. Conduct a test point analysis on the content and navigation requirements. Test point analysis is a more specialized estimation technique and is not generally the most appropriate choice for estimating testing in every Sprint. - D. Use metrics from the last accessibility project at MSC. Historical metrics can be useful as a reference, but using data from a specific previous project may not reflect the current Sprint’s scope, technology, or testing needs. In summary: The most appropriate method is the one that directly involves the testers in estimating based on the current Sprint’s work, so A is the best answer.
Right Answer: A
Quiz
Question 10/1010/10
Which of the following is the main purpose of an incident tracking process?
Select the answer:Select the answer
1 correct answer
A.
To identify the average number of steps required to recreate each incident.
B.
To calculate the average turnaround times per defect.
C.
To identify the priority of each incident.
D.
To understand the status of each incident at any given time.
The correct answer is D. To understand the status of each incident at any given time. An incident tracking process is used to monitor and record incidents from the moment they are reported until they are resolved. Its main purpose is to provide visibility into each incident’s current state, such as whether it is new, in progress, waiting for information, resolved, or closed. This helps teams: - Know what incidents are open - See who is working on them - Track progress toward resolution - Ensure nothing is forgotten or delayed - Communicate status clearly to stakeholders Why the other options are incorrect: - A. To identify the average number of steps required to recreate each incident. This relates more to incident reproduction or defect analysis, not tracking. - B. To calculate the average turnaround times per defect. This is about measuring performance metrics, not the main purpose of tracking incidents. - C. To identify the priority of each incident. Priority may be recorded as part of incident management, but it is not the main purpose of the tracking process. In short, incident tracking is primarily about maintaining up-to-date visibility into each incident’s status throughout its lifecycle.
CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) Practice test unlocks all online simulator questions
Thank you for choosing the free version of the CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) practice test! Further deepen your knowledge on GAQM Simulator; by unlocking the full version of our CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) Simulator you will be able to take tests with over 25 constantly updated questions and easily pass your exam. 98% of people pass the exam in the first attempt after preparing with our 25 questions.
What to expect from our CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) practice tests and how to prepare for any exam?
The CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) Simulator Practice Tests are part of the GAQM Database and are the best way to prepare for any CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) exam. The CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) practice tests consist of 25 questions and are written by experts to help you and prepare you to pass the exam on the first attempt. The CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) database includes questions from previous and other exams, which means you will be able to practice simulating past and future questions. Preparation with CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) Simulator will also give you an idea of the time it will take to complete each section of the CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) practice test . It is important to note that the CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) Simulator does not replace the classic CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) study guides; however, the Simulator provides valuable insights into what to expect and how much work needs to be done to prepare for the CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) exam.
CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) Practice test therefore represents an excellent tool to prepare for the actual exam together with our GAQM practice test . Our CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) Simulator will help you assess your level of preparation and understand your strengths and weaknesses. Below you can read all the quizzes you will find in our CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) Simulator and how our unique CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) Database made up of real questions:
You can prepare for the CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) exams with our mobile app. It is very easy to use and even works offline in case of network failure, with all the functions you need to study and practice with our CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) Simulator.
Use our Mobile App, available for both Android and iOS devices, with our CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) Simulator . You can use it anywhere and always remember that our mobile app is free and available on all stores.
Our Mobile App contains all CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) practice tests which consist of 25 questions and also provide study material to pass the final CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) exam with guaranteed success.
Our CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) database contain hundreds of questions and GAQM Tests related to CTIL-001: GAQM Certified Software Tester - Intermediate Level (CSTIL) Exam. This way you can practice anywhere you want, even offline without the internet.