The new flashcard feature is useful to memorize questions.
?Change your study mode
At any time, you can change the study mode, and alternate between the practice mode and the exam mode. In practice mode, you can configure for example the number of questions or tests, and other parameters to help you study.
Randomized | 10 Questions per Test | 20 Minutes | 70% to pass|
To re-configure your study mode again and change - for example - the number of tests, whether you have random questions and all other configuration parameters.
?Simulator Configuration
Auto-scroll: You can use the automatic scrolling of the questionnaire that occurs as soon as you answer one or all of the answers to a question correctly. Auto scrolling is activated if you answer a single answer, or as soon as you answer all the mandatory answers. Learning Mode: During learning mode you can get a real time result for your answer.
Free Test
Question: / 10
20:00Min. left
?Restart the current test
To restart the current test by clearing all your answers and the time used up to now. Warning: all answers will be lost.
Question: / 10
4.9(145 Votes)
Quiz
Question 1/101/10
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this? There are 2 correct answers to this question. Response:
Select multiple answer: (Choose 2)Select the answer
2 correct answers
A.
Check for running batch jobs in the shadow system via Job Overview (SM37)
B.
Check for running R3trans processes on the host of the primary application server
C.
Check for running R31oad processes on the host of the primary application server
D.
Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
The correct answers are B and D. During the SUM phase SHADOW_IMPORT_INC, the shadow system is importing ABAP objects into the shadow instance. To verify that this phase is still running properly, you typically check two kinds of information: B. Check for running R3trans processes on the host of the primary application server R3trans is the transport tool used during import activities. If SHADOW_IMPORT_INC is active and working, you should see R3trans processes running on the relevant host. This is a good technical indicator that the import is still in progress. D. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp SUM writes detailed phase logs into its directory structure. The ABAP/tmp subdirectory contains the latest log files for ABAP-related phases, including SHADOW_IMPORT_INC. These logs are the best place to see current progress, errors, or whether the phase has stalled. Why the other options are not correct: A. Check for running batch jobs in the shadow system via Job Overview (SM37) SM37 shows background jobs, but SHADOW_IMPORT_INC is not primarily monitored through batch jobs. The import process is better tracked through SUM logs and transport-related processes. C. Check for running R31oad processes on the host of the primary application server R31oad is not the relevant process for this SUM phase. The import activity is associated with R3trans, not R31oad. In short: To monitor SHADOW_IMPORT_INC, use the transport process view and the SUM log files, which correspond to options B and D.
Right Answer: B, D
Quiz
Question 2/102/10
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison? Please choose the correct answer. Response:
Select the answer:Select the answer
1 correct answer
A.
It performs a comparison on selected tables using check sum.
B.
It performs a comparison on all tables using row counts.
C.
It performs a comparison of all tables using check sum.
D.
It does NOT perform any table comparison.
The correct answer is B. It performs a comparison on all tables using row counts. During the DMO (Database Migration Option) configuration in SUM, the option "Do not compare table contents" sounds like it would skip comparisons entirely. However, in this context, it specifically means that the tool does not perform a detailed content comparison such as checksum-based comparison. Instead, SUM still performs a lighter comparison of all tables using row counts. This helps verify that the number of records in the source and target tables matches, without checking the actual row contents. Why the other options are wrong: A. It performs a comparison on selected tables using check sum. This is incorrect because the option does not switch to checksum-based comparison for selected tables. C. It performs a comparison of all tables using check sum. This is the opposite of the intended behavior. Checksum comparison is more detailed and is not used when this option is selected. D. It does NOT perform any table comparison. This is incorrect because SUM still compares tables, just not their contents in detail. It uses row counts instead. So the key point is: selecting "Do not compare table contents" disables content-level comparison, but table comparison by row count still happens for all tables.
Right Answer: B
Quiz
Question 3/103/10
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results? There are 2 correct answers to this question. Response:
Select multiple answer: (Choose 2)Select the answer
2 correct answers
A.
SYCM (Simplification Database Content)
B.
SAT (Runtime Analysis)
C.
ATC (ABAP Test Cockpit)
D.
SE80 (Object Navigator)
The correct answers are C. ATC (ABAP Test Cockpit) and D. SE80 (Object Navigator). When you perform a custom code check as part of an SAP S/4HANA conversion, the results are typically made available in tools that support ABAP code analysis and navigation. C. ATC (ABAP Test Cockpit) ATC is the main tool used to run and review checks for custom code during an SAP S/4HANA conversion. It provides findings about compatibility issues, simplification-related problems, and code that may need adjustment. This is one of the primary places where you can review the results of the custom code check. D. SE80 (Object Navigator) SE80 can be used to navigate to ABAP objects and inspect code objects that were identified by the check. While SE80 is not the main analysis tool itself, it can be used to review affected custom objects and related code directly after identifying issues. Why the other options are incorrect: A. SYCM (Simplification Database Content) SYCM is related to simplification item database content and compatibility checks, but it is not the standard transaction used to review custom code check results. B. SAT (Runtime Analysis) SAT is used for runtime performance analysis and tracing ABAP execution, not for reviewing custom code check results from an S/4HANA conversion assessment. In summary, ATC is the primary review tool, and SE80 can be used to inspect the affected code objects, so the correct answers are C and D.
Right Answer: C, D
Quiz
Question 4/104/10
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox? Please choose the correct answer. Response:
Select the answer:Select the answer
1 correct answer
A.
/ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
B.
/ASU/SSM (ASU Simple Schedule Manager)
C.
/ASU/SHOW_NOTE (Show SAP Note via Web-Browser)
D.
/ASU/START (Start ASU Toolbox)
The correct answer is D. /ASU/START SAP Note 1000009 delivers content for the ASU Toolbox 2008. After downloading and implementing that content, you need to start the ASU Toolbox itself in order to access and use the imported material. The transaction /ASU/START is the standard entry point to launch the ASU Toolbox. It opens the toolbox interface where the downloaded content can be used. Why the other options are incorrect: A. /ASU/UPGRADE This is used to start the ASU Toolbox in upgrade mode, which is a special mode for upgrade-related activities. It is not the general transaction needed just to use the downloaded content. B. /ASU/SSM This refers to the ASU Simple Schedule Manager, which is a different function and not the main transaction for accessing the toolbox content. C. /ASU/SHOW_NOTE This is used to display an SAP note in a web browser. It does not start the ASU Toolbox for using the downloaded content. Therefore, the correct transaction is /ASU/START.
Right Answer: D
Quiz
Question 5/105/10
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues? There are 2 correct answers to this question. Response:
Select multiple answer: (Choose 2)Select the answer
2 correct answers
A.
Create "modified* versions of the objects that you need to adjust
B.
Release the transport request containing the modification adjustment
C.
Assign the transport request as a modification adjustment transport
D.
Manually activate the adjusted dictionary objects
The correct answers are A and C. SPDD is the adjustment phase for dictionary objects during an SAP upgrade or enhancement package implementation. This step is typically done in the development system before SUM can proceed with the upgrade. What you need to do in this phase: - Review the modified dictionary objects - Compare the SAP standard version with the customer-modified version - Keep, adjust, or discard changes as needed - Save the adjustment results into a transport request Why A is correct: Create "modified" versions of the objects that you need to adjust. During SPDD, when you adapt dictionary objects that have been modified in the customer namespace, you create adjusted versions of those objects. This is part of preserving customer changes while aligning with the new SAP standard. Why C is correct: Assign the transport request as a modification adjustment transport. The adjustments made in SPDD must be recorded in a transport request so they can be moved appropriately through the landscape. Assigning the request as a modification adjustment transport ensures the changes are managed correctly by SUM. Why B is incorrect: Release the transport request containing the modification adjustment. Releasing the transport request is usually not the key SPDD prerequisite before SUM continues in the development system. The important action is that the adjustment is recorded and assigned correctly; release may happen later depending on the procedure and system setup. Why D is incorrect: Manually activate the adjusted dictionary objects. Activation may be part of the technical process in some cases, but it is not one of the required steps specifically asked for in this question. The essential SPDD-related actions here are creating the adjusted versions and assigning the transport request properly. Summary: In SPDD, before SUM continues in the development system, you should: - Create modified versions of the objects to adjust - Assign the transport request as a modification adjustment transport So the correct answers are A and C.
Right Answer: A, C
Quiz
Question 6/106/10
Which preparational steps must be performed for an SAP S/4HANA conversion? There are 2 correct answers to this question. Response:
Select multiple answer: (Choose 2)Select the answer
2 correct answers
A.
Uninstall industry extensions not supported by SAP S/4HANA
B.
Install add-on SAP Gateway 7.50
C.
Uninstall Fiori apps not released for SAP_UI 7.50
D.
Delete client 066 (Early Watch Client)
The correct answers are C and D. Before converting an SAP ERP system to SAP S/4HANA, some preparational cleanup steps are required to avoid compatibility and technical issues during the conversion. C. Uninstall Fiori apps not released for SAP_UI 7.50 This is correct because SAP S/4HANA conversion requires checking the compatibility of installed UI components and Fiori apps. Apps that are not released for the target SAP_UI version may cause issues after the conversion and therefore need to be removed or replaced before starting the process. D. Delete client 066 (Early Watch Client) This is correct because client 066 is used by SAP for service and monitoring purposes, but it is not needed in the converted system and should be deleted as part of the preparatory steps. This helps simplify the system and avoid unnecessary data during the conversion. Why the other options are incorrect: A. Uninstall industry extensions not supported by SAP S/4HANA This is not a universal required preparational step in the way the question asks. Some industry add-ons or extensions may need checks, adjustments, or updates, but not all unsupported industry extensions are specifically listed as mandatory preparatory steps in this context. B. Install add-on SAP Gateway 7.50 This is incorrect because SAP Gateway 7.50 is not generally something that must be installed as a preparatory step for every SAP S/4HANA conversion. In many cases, the gateway functionality is already integrated or handled differently depending on the scenario. Summary: The required preparational steps are: - C. Uninstall Fiori apps not released for SAP_UI 7.50 - D. Delete client 066 (Early Watch Client) If you want, I can also explain how SAP S/4HANA conversion preparation is typically organized into technical, functional, and simplification steps.
Right Answer: C, D
Quiz
Question 7/107/10
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase? There are 2 correct answers to this question. Response:
Select multiple answer: (Choose 2)Select the answer
2 correct answers
A.
Run the database migration to the SAP HANA database
B.
Perform the migration of data into the new data structure
C.
Check the compatibility of custom code with SAP S/4HANA
D.
Apply the recommendations of the simplification list
The correct answers are C and D. In an SAP S/4HANA system conversion, the preparation phase includes activities that ensure your existing SAP ERP system is ready for the technical and functional changes required by the conversion. Why C is correct: C. Check the compatibility of custom code with SAP S/4HANA During preparation, you must analyze custom developments to identify objects that are not compatible with SAP S/4HANA. This is important because S/4HANA removes or changes many classic data models, tables, and transactions. Tools such as the SAP Readiness Check and ABAP Test Cockpit are often used to assess custom code impact before conversion. Why D is correct: D. Apply the recommendations of the simplification list The simplification list contains key functional and technical changes in SAP S/4HANA, including deleted transactions, replaced tables, and required process changes. Reviewing and acting on these recommendations is a core preparation activity because it helps avoid conversion issues and ensures the system meets the new requirements. Why A is incorrect: A. Run the database migration to the SAP HANA database This is not part of the preparation phase. For a system conversion, the system is already being transformed to SAP S/4HANA, and the technical conversion steps are handled later in the process. Database migration may be part of a separate step depending on the starting system, but it is not a preparation-phase conversion-specific task in this question. Why B is incorrect: B. Perform the migration of data into the new data structure This happens during the actual conversion process, not during preparation. In preparation, you analyze what needs to change; the data transformation into the new S/4HANA data structures occurs later as part of the technical conversion and follow-up activities. Summary: The preparation phase focuses on readiness checks and impact analysis. Therefore, the correct answers are: C. Check the compatibility of custom code with SAP S/4HANA D. Apply the recommendations of the simplification list
Right Answer: C, D
Quiz
Question 8/108/10
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel. Why are 40 Process Buckets executed in parallel? Please choose the correct answer. Response:
Select the answer:Select the answer
1 correct answer
A.
There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
B.
SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
C.
The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
D.
These are 40 pairs of R3load processes, so there are 80 R3load processes running.
The correct answer is D. These are 40 pairs of R3load processes, so there are 80 R3load processes running. In DMO of SUM, the number of parallel R3load processes can be defined differently for uptime and downtime. Here, you set: - 40 parallel R3load processes during uptime - 80 parallel R3load processes during downtime The phase EU_CLONE_MIG_DT_RUN is a downtime phase, so the downtime setting applies. In this phase, SUM groups the R3load activity into Process Buckets. Each bucket represents a pair of R3load processes. So if 40 Process Buckets are executed in parallel, that means: - 40 buckets - 2 R3load processes per bucket - 80 R3load processes running in total Why the other options are incorrect: A. There is a maximum of 40 parallel R3load processes within this specific downtime phase. Incorrect. The configured downtime value is 80, not 40. B. SUM is still running in uptime; the number of 40 defined R3load processes is considered. Incorrect. The phase name shows it is a downtime phase, so uptime settings do not apply. C. The number of CPU cores does not allow more than 40 R3load processes to be run in parallel. Incorrect. CPU cores may influence performance, but they do not explain why exactly 40 buckets are shown. In short, 40 Process Buckets in this context correspond to 80 R3load processes, which is why D is correct.
Right Answer: D
Quiz
Question 9/109/10
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance? There are 2 correct answers to this question. Response:
Select multiple answer: (Choose 2)Select the answer
2 correct answers
A.
Conversion of application tables (PARCONV_UPG)
B.
Activation of dictionary objects (ACT_UPG)
C.
Switch to new repository (EU_SWITCH)
D.
Modification adjustment (SPDD)
The correct answers are B. Activation of dictionary objects (ACT_UPG) and D. Modification adjustment (SPDD). When you choose the Advanced option in the Software Update Manager (SUM), certain activities are performed using the shadow instance. The shadow instance is a temporary duplicate of the system that is built to prepare and test changes while the main system is still running. Why B is correct: Activation of dictionary objects (ACT_UPG) takes place in the shadow instance because repository and Dictionary-related changes must be prepared before the final switch. This helps ensure that the system is ready for the technical upgrade or migration. Why D is correct: Modification adjustment (SPDD) is also handled via the shadow instance in Advanced mode. SPDD is used to reconcile custom modifications of ABAP Dictionary objects with the new SAP delivery contents. Doing this in the shadow instance allows the upgrade process to continue with minimal downtime. Why A is not correct: Conversion of application tables (PARCONV_UPG) is not one of the steps that takes place via the shadow instance in this context. Table conversion is generally handled in other phases of the SUM process, not specifically as a shadow-instance activity for the Advanced option. Why C is not correct: Switch to new repository (EU_SWITCH) is part of the repository switch phase, but it is not the step identified here as being performed via the shadow instance for the question asked. The question specifically asks which steps take place via the shadow instance, and EU_SWITCH is not one of the correct answers. Summary: In Advanced mode, the shadow instance is used for: - B. Activation of dictionary objects (ACT_UPG) - D. Modification adjustment (SPDD) If you want, I can also explain how the shadow instance is used in SUM phase by phase.
Right Answer: B, D
Quiz
Question 10/1010/10
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"? There are 2 correct answers to this question. Response:
Select multiple answer: (Choose 2)Select the answer
2 correct answers
A.
Keep archiving on during the whole procedure.
B.
Use the Near Zero Downtime Maintenance Technology (NZDM).
C.
Reuse a profile for the shadow instance from a previous run.
D.
Choose the instance number of the shadow instance.
The correct answers are C and D. When you select "Switch expert mode on" in SUM under the main configuration option "Standard," SUM exposes additional advanced configuration settings that are not available in the basic mode. These expert options allow more detailed control over the shadow system setup. Why C is correct: "Reuse a profile for the shadow instance from a previous run" is an expert-mode option. It lets you reuse an existing shadow instance profile instead of creating a completely new one, which can be useful in repeat or recovery scenarios. Why D is correct: "Choose the instance number of the shadow instance" is also an expert-mode option. In standard mode, SUM typically assigns this automatically. In expert mode, you can manually specify the shadow instance number for greater control and compatibility with the system landscape. Why A is incorrect: "Keep archiving on during the whole procedure" is not one of the additional options enabled by switching on expert mode in the Standard configuration. It is related to operational behavior, but not specifically an expert-mode configuration choice here. Why B is incorrect: "Use the Near Zero Downtime Maintenance Technology (NZDM)" is a separate SUM scenario and is not an additional configuration option offered by switching expert mode on in the Standard setup. In summary, the expert mode in Standard provides more control over shadow instance settings, including reusing a shadow profile and manually selecting the shadow instance number.
E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Practice test unlocks all online simulator questions
Thank you for choosing the free version of the E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade practice test! Further deepen your knowledge on SAP Simulator; by unlocking the full version of our E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Simulator you will be able to take tests with over 80 constantly updated questions and easily pass your exam. 98% of people pass the exam in the first attempt after preparing with our 80 questions.
What to expect from our E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade practice tests and how to prepare for any exam?
The E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Simulator Practice Tests are part of the SAP Database and are the best way to prepare for any E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade exam. The E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade practice tests consist of 80 questions and are written by experts to help you and prepare you to pass the exam on the first attempt. The E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade database includes questions from previous and other exams, which means you will be able to practice simulating past and future questions. Preparation with E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Simulator will also give you an idea of the time it will take to complete each section of the E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade practice test . It is important to note that the E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Simulator does not replace the classic E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade study guides; however, the Simulator provides valuable insights into what to expect and how much work needs to be done to prepare for the E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade exam.
E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Practice test therefore represents an excellent tool to prepare for the actual exam together with our SAP practice test . Our E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Simulator will help you assess your level of preparation and understand your strengths and weaknesses. Below you can read all the quizzes you will find in our E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Simulator and how our unique E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Database made up of real questions:
Info quiz:
Quiz name:E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade
Total number of questions:80
Number of questions for the test:50
Pass score:80%
You can prepare for the E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade exams with our mobile app. It is very easy to use and even works offline in case of network failure, with all the functions you need to study and practice with our E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Simulator.
Use our Mobile App, available for both Android and iOS devices, with our E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Simulator . You can use it anywhere and always remember that our mobile app is free and available on all stores.
Our Mobile App contains all E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade practice tests which consist of 80 questions and also provide study material to pass the final E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade exam with guaranteed success.
Our E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade database contain hundreds of questions and SAP Tests related to E_S4HCON2023: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Exam. This way you can practice anywhere you want, even offline without the internet.