The new flashcard feature is useful to memorize questions.
?Change your study mode
At any time, you can change the study mode, and alternate between the practice mode and the exam mode. In practice mode, you can configure for example the number of questions or tests, and other parameters to help you study.
Randomized | 10 Questions per Test | 20 Minutes | 70% to pass|
To re-configure your study mode again and change - for example - the number of tests, whether you have random questions and all other configuration parameters.
?Simulator Configuration
Auto-scroll: You can use the automatic scrolling of the questionnaire that occurs as soon as you answer one or all of the answers to a question correctly. Auto scrolling is activated if you answer a single answer, or as soon as you answer all the mandatory answers. Learning Mode: During learning mode you can get a real time result for your answer.
Free Test
Question: / 10
20:00Min. left
?Restart the current test
To restart the current test by clearing all your answers and the time used up to now. Warning: all answers will be lost.
Question: / 10
4.7(121 Votes)
Quiz
Question 1/101/10
What are two timestamps required to measure lead time when using a Team Kanban board? (Choose two.)
Select multiple answer: (Choose 2)Select the answer
2 correct answers
A.
When the Story is released to users and validated
B.
When the Story is deployed
C.
When the Agile Team pulls a Story onto the board
D.
When the Story is accepted by the Product Owner
E.
When the team completes validation of the Story
In SAFe (Scaled Agile Framework), lead time is an essential metric used to measure the efficiency and effectiveness of a process. Lead time is defined as the total time it takes for a work item to move through the entire process from the moment it is initiated until it is completed. To measure lead time accurately using a Team Kanban board, two specific timestamps are crucial: When the Agile Team pulls a Story onto the board (Timestamp C): This is the starting point of the lead time. It marks the moment when the team commits to working on a particular story by pulling it into the workflow. This action indicates that the story is now in progress and the clock starts ticking from this point. When the Story is accepted by the Product Owner (Timestamp D): This is the endpoint of the lead time. It signifies that the story has been completed to the satisfaction of the team and has met the acceptance criteria defined by the Product Owner. When the Product Owner accepts the story, it indicates that the work is done and the lead time measurement stops. These two timestamps effectively capture the duration a story takes to go through the development process, providing valuable insights into process efficiency and identifying areas for improvement. SAFe Scrum Master Reference SAFe Advanced Scrum Master learning materials SAFe 5.0 Scrum Master Certification resources The 2020 Scrum Guide: Scrum Guide 2020 This information aligns with the principles and practices outlined in the SAFe framework and the Scrum Guide, ensuring a comprehensive understanding of lead time measurement within a Team Kanban board context.
Right Answer: C, D
Quiz
Question 2/102/10
Which two events provide opportunities for the team to collaborate? (Choose two.)
Select multiple answer: (Choose 2)Select the answer
2 correct answers
A.
Iteration Planning
B.
Portfolio Sync
C.
Solution Demo
D.
Pre-PI Planning
E.
Backlog refinement
Iteration Planning: Purpose: Iteration Planning is a crucial event where the team collaborates to determine what will be delivered in the upcoming iteration and how the work will be accomplished. The entire team, including the Scrum Master, Product Owner, and Developers, come together to plan the iteration's work. Process: The Product Owner presents the prioritized backlog items to the team. The team discusses each item, clarifies any ambiguities, and breaks down the items into tasks. The team estimates the effort required for each task and commits to what they believe can be achieved in the iteration. Outcome: A detailed iteration plan that includes the selected backlog items and a clear understanding of the tasks and responsibilities for each team member. Backlog Refinement: Purpose: Backlog Refinement (also known as Grooming) is an ongoing process where the team and the Product Owner collaborate to review and update the backlog. This ensures that the backlog is in good shape for future iteration planning. Process: The team reviews the items in the backlog to ensure they are well understood and ready for future iterations. The Product Owner provides context and clarifications for each backlog item. The team discusses the requirements, refines the acceptance criteria, and estimates the effort required for each item. The backlog items are prioritized based on their value and urgency. Outcome: A well-maintained and prioritized backlog that facilitates effective and efficient iteration planning. SAFe Scrum Master Reference: Iteration Planning: SAFe Advanced Scrum Master training materials emphasize the importance of Iteration Planning as a key event for team collaboration, ensuring everyone is aligned on the iteration goals and tasks. 2020 Scrum Guide: The Iteration Planning section outlines the collaborative nature of this event and its role in setting the stage for successful iterations. Backlog Refinement: In the SAFe framework, Backlog Refinement is highlighted as an essential activity to maintain a healthy backlog, allowing the team to prepare for future iterations effectively. Scrum Open: This document discusses the significance of Backlog Refinement in fostering team collaboration and ensuring the backlog is well-groomed and ready for planning.
Right Answer: A, E
Quiz
Question 3/103/10
Which statement is true about batch size, lead time, and utilization?
Select the answer:Select the answer
1 correct answer
A.
Higher team member utilization leads to longer lead times
B.
There is no direct relationship between lead time and utilization
C.
As batch size increases, lead time decreases
D.
There is no direct relationship between lead time and batch size
Utilization refers to the percentage of a team's capacity that is being used. When team members are highly utilized (i.e., their capacity is nearly fully booked), it often leads to longer lead times. This is because: High utilization reduces the team's flexibility to handle new or unexpected work. It can cause bottlenecks as individuals or teams become overburdened with tasks. There is less room for managing variability, leading to delays and increased cycle times. In contrast, lower utilization rates typically allow for more flexibility and quicker response times, reducing lead times. Therefore, higher utilization generally results in longer lead times due to increased bottlenecks and reduced capacity to handle new tasks efficiently. SAFe Scrum Master Reference SAFe Advanced Scrum Master learning materials Principles of Lean-Agile development: optimizing flow by managing queue lengths and reducing batch sizes to improve lead times and throughput.
Right Answer: A
Quiz
Question 4/104/10
How can a Scrum Master help the team remain focused on achieving their Iteration goals?
Select the answer:Select the answer
1 correct answer
A.
By supporting the rules of the team process
B.
By leading a team's efforts in relentless improvements
C.
By eliminating impediments
D.
By exhibiting Lean-Agile Leadership
One of the key responsibilities of a Scrum Master is to help the team stay focused on their Iteration goals. This involves removing any obstacles or impediments that may hinder their progress. By eliminating impediments, the Scrum Master ensures that the team can work more efficiently and effectively, thereby maintaining their focus on achieving the goals set for the iteration. Steps to eliminate impediments include: Regularly communicating with the team to identify any obstacles they are facing. Collaborating with stakeholders and other teams to resolve issues quickly. Ensuring that any identified impediments are documented and tracked until they are resolved. Facilitating problem-solving sessions and using techniques such as root cause analysis to address underlying issues. By proactively removing these barriers, the Scrum Master supports the team in maintaining a steady and uninterrupted workflow, which is crucial for meeting iteration goals. SAFe Scrum Master Reference SAFe Scrum Master Role and Responsibilities The 2020 Scrum Guide: Scrum Guide 2020 Principles of Lean-Agile Leadership in SAFe: focusing on continuous improvement and supporting the team in overcoming obstacles.
Right Answer: C
Quiz
Question 5/105/10
Which of the SAFe Core Values enables trust across the ART?
Select the answer:Select the answer
1 correct answer
A.
Transparency
B.
Adaptation
C.
Built-in Quality
D.
Decentralized decision-making
SAFe Core Values are the fundamental beliefs that guide behaviors and decision-making in SAFe (Scaled Agile Framework). They are critical for fostering a culture that supports Lean-Agile principles. Transparency: Definition: Transparency in SAFe means having an open and honest environment where everyone has access to the information they need. It involves making work visible to all stakeholders, sharing risks, and ensuring that everyone understands the status of the work. Importance: Transparency enables trust across the Agile Release Train (ART) because it ensures that everyone is aware of what is happening, leading to informed decision-making and reducing misunderstandings. It builds a culture of openness and accountability. SAFe Framework Reference: In SAFe, transparency is crucial for effective collaboration and alignment across teams and stakeholders. It ensures that progress, challenges, and changes are communicated openly, fostering trust and collective problem-solving. SAFe Scrum Master Reference: SAFe training materials emphasize the importance of transparency as a core value that underpins trust and collaboration within and across teams. The SAFe website and guides detail how transparency is implemented through various practices like visual management, open communication, and regular feedback loops.
Right Answer: A
Quiz
Question 6/106/10
Which two Framework elements would a Scrum Master have the strongest connection and most frequent interaction? (Choose two.)
Select multiple answer: (Choose 2)Select the answer
2 correct answers
A.
Business Owners
B.
Release Train Engineer
C.
Systems Team
D.
Product Owner
E.
Epic Owner
Release Train Engineer (RTE): Role: The RTE is a servant leader and coach for the Agile Release Train (ART). They facilitate ART events and processes, assist teams in delivering value, and help manage risks and dependencies. Interaction with Scrum Master: Scrum Masters frequently collaborate with the RTE to coordinate cross-team activities and dependencies. They work together during events like PI Planning, Scrum of Scrums, and Inspect & Adapt (I&A) workshops to ensure alignment and continuous improvement. The RTE provides support and guidance to Scrum Masters, helping them resolve impediments that affect the ART. Product Owner (PO): Role: The Product Owner is responsible for defining and prioritizing the team backlog, ensuring that the team is working on the most valuable tasks. Interaction with Scrum Master: Scrum Masters work closely with Product Owners to facilitate effective backlog refinement sessions, ensuring that the backlog items are well-understood and ready for iteration planning. They support the Product Owner in maintaining a clear and prioritized backlog, helping to communicate the vision and goals to the team. During iteration planning and reviews, Scrum Masters assist Product Owners in engaging with the team and stakeholders, ensuring that feedback is collected and incorporated. SAFe Scrum Master Reference: Release Train Engineer: SAFe materials outline the critical role of the RTE in coordinating the ART and supporting Scrum Masters in their efforts to remove impediments and ensure smooth execution of plans. Scrum Open: Discusses the collaborative relationship between Scrum Masters and RTEs in facilitating ART events and managing dependencies. Product Owner: The SAFe framework emphasizes the importance of the Scrum Master-Product Owner partnership in driving the delivery of value and maintaining a healthy backlog. Product Owner Open: Provides insights into how Scrum Masters and Product Owners work together to align on priorities and ensure the team is focused on the right tasks.
Right Answer: B, D
Quiz
Question 7/107/10
What is the primary goal of decentralized decision-making?
Select the answer:Select the answer
1 correct answer
A.
To resolve dependencies
B.
To minimize VVIP www
C.
To empower knowledge workers
D.
To reduce delay
Decentralized decision-making is a principle in SAFe aimed at distributing decision authority to the people closest to the information and most affected by the decisions. The primary goal of decentralized decision-making is to reduce delay in the decision-making process, which can often occur when decisions need to pass through multiple layers of hierarchy. By empowering individuals and teams to make decisions quickly, organizations can respond faster to changes, improve agility, and maintain a steady flow of work.
Right Answer: D
Quiz
Question 8/108/10
What goes into the Portfolio Backlog?
Select the answer:Select the answer
1 correct answer
A.
Strategic Themes
B.
Projects
C.
Capabilities
D.
Epics
The Portfolio Backlog in SAFe contains the larger initiatives, known as Epics. Epics are substantial pieces of work that require analysis, investment, and development effort over multiple Program Increments (PIs). They represent significant business or technical needs that drive the long-term strategy of the organization. These Epics are prioritized and managed in the Portfolio Backlog, where they can be decomposed into smaller, actionable items as they progress through the development process.
Right Answer: D
Quiz
Question 9/109/10
Why is the program predictability measure the primary Metric used during the quantitative measurement part of the Inspect and Adapt event?
Select the answer:Select the answer
1 correct answer
A.
To measure the predictability of business value delivered in the PI timebox
B.
To predict the scope of the remaining requirements in the Program Backlog
C.
To forecast when remaining features could be delivered to customers
D.
To match customer demand to the Agile Release Train's velocity
The program predictability measure is the primary metric used during the quantitative measurement part of the Inspect and Adapt (I&A) event in SAFe. This measure assesses how reliably the Agile Release Train (ART) can deliver business value within the Program Increment (PI) timebox. It helps to: Evaluate the team's ability to meet their commitments. Identify areas where predictability can be improved. Ensure that the business value planned for the PI is actually delivered. By focusing on the predictability of business value, organizations can better align their planning and execution efforts, ultimately enhancing customer satisfaction and achieving strategic goals more effectively. SAFe Scrum Master Reference SAFe Inspect and Adapt events SAFe 5.0 framework: using program predictability as a key metric to assess and improve ART performance.
Right Answer: A
Quiz
Question 10/1010/10
If the distance between the arrival and departure curves on a team's cumulative flow diagram is growing apart, what is likely happening?
Select the answer:Select the answer
1 correct answer
A.
Lead time is increasing
B.
Unplanned work is pushed into the backlog
C.
WIP is decreasing
D.
The backlog is being reprioritized
Cumulative Flow Diagram (CFD): A CFD is a visual tool used in Kanban and Scrum to show the progress of work items through different stages of the workflow over time. Arrival and Departure Curves: These curves represent the work items entering (arrival) and leaving (departure) the system. Growing Distance: If the distance between the arrival and departure curves on the CFD is growing apart, it indicates that work items are taking longer to move through the system. Lead Time: This term refers to the total time from when a work item is created until it is completed. An increasing distance between the curves means that work items are spending more time in the system, thus increasing the lead time. SAFe Scrum Master Reference: SAFe materials on flow metrics and Kanban principles highlight the importance of monitoring lead time and using CFDs to identify bottlenecks and inefficiencies in the workflow.
SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master Practice test unlocks all online simulator questions
Thank you for choosing the free version of the SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master practice test! Further deepen your knowledge on Scaled Agile Simulator; by unlocking the full version of our SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master Simulator you will be able to take tests with over 60 constantly updated questions and easily pass your exam. 98% of people pass the exam in the first attempt after preparing with our 60 questions.
What to expect from our SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master practice tests and how to prepare for any exam?
The SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master Simulator Practice Tests are part of the Scaled Agile Database and are the best way to prepare for any SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master exam. The SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master practice tests consist of 60 questions and are written by experts to help you and prepare you to pass the exam on the first attempt. The SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master database includes questions from previous and other exams, which means you will be able to practice simulating past and future questions. Preparation with SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master Simulator will also give you an idea of the time it will take to complete each section of the SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master practice test . It is important to note that the SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master Simulator does not replace the classic SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master study guides; however, the Simulator provides valuable insights into what to expect and how much work needs to be done to prepare for the SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master exam.
SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master Practice test therefore represents an excellent tool to prepare for the actual exam together with our Scaled Agile practice test . Our SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master Simulator will help you assess your level of preparation and understand your strengths and weaknesses. Below you can read all the quizzes you will find in our SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master Simulator and how our unique SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master Database made up of real questions:
You can prepare for the SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master exams with our mobile app. It is very easy to use and even works offline in case of network failure, with all the functions you need to study and practice with our SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master Simulator.
Use our Mobile App, available for both Android and iOS devices, with our SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master Simulator . You can use it anywhere and always remember that our mobile app is free and available on all stores.
Our Mobile App contains all SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master practice tests which consist of 60 questions and also provide study material to pass the final SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master exam with guaranteed success.
Our SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master database contain hundreds of questions and Scaled Agile Tests related to SAFe-SASM: Scaled Agile SAFe Advanced Scrum Master Exam. This way you can practice anywhere you want, even offline without the internet.